{"source":"https://www.openstreetmap.org/","license":"ODbL 1.0; https://www.openstreetmap.org/copyright","checked":"2026-10-24","ways":[{"id":"57899128","name":"花畑大橋通り","highway":"tertiary","coordinates":[[139.8111218,35.7786665],[139.8111231,35.7787325],[139.8111232,35.7787702],[139.8110905,35.7791687],[139.8110139,35.779981],[139.8110104,35.7800412],[139.8110059,35.7801178],[139.8109369,35.780838],[139.8109305,35.7808888],[139.8109265,35.7809335],[139.8108629,35.7816162],[139.810858,35.7816777],[139.8108544,35.7817184],[139.8107809,35.7825189],[139.8107707,35.7826665],[139.8107653,35.7827832],[139.81073,35.7838124],[139.810727,35.7838833],[139.8107249,35.7839444],[139.8106945,35.7848416],[139.8106927,35.7849088],[139.8106898,35.7849888],[139.8106512,35.7860995],[139.8106489,35.7861657],[139.8106477,35.7862167],[139.8106442,35.7863048],[139.8106428,35.7863555],[139.8106412,35.7864097],[139.8106356,35.7866074],[139.8106336,35.7866785],[139.8106217,35.7870588],[139.8106123,35.7873928],[139.8106094,35.7874752],[139.8106082,35.7875625],[139.8105984,35.7880672],[139.8105946,35.7881514],[139.8105923,35.7882178],[139.8105851,35.7884665],[139.8105789,35.7886816],[139.8105779,35.7887156],[139.8105768,35.7887536],[139.8105674,35.789076],[139.8105571,35.7894992],[139.8105507,35.7896183]]},{"id":"101970415","name":"","highway":"unclassified","coordinates":[[139.8056416,35.779983],[139.8056304,35.7803082],[139.8056244,35.7805107],[139.8056269,35.7807339],[139.8056178,35.7814885],[139.8056128,35.7818674],[139.8056051,35.7821829],[139.8056046,35.7824834],[139.8055977,35.7826729],[139.8055958,35.7827235],[139.8055941,35.7827816],[139.8055783,35.7833046],[139.8055565,35.7833458],[139.8055467,35.7835052]]},{"id":"101970511","name":"","highway":"unclassified","coordinates":[[139.8041769,35.7827391],[139.8041891,35.782706],[139.8042226,35.7826799],[139.8044515,35.7825492],[139.8046963,35.7824265],[139.8047958,35.7823781],[139.8048599,35.7823477],[139.8049594,35.7823037],[139.8050893,35.7822583],[139.8053662,35.7822042],[139.8056051,35.7821829],[139.8058998,35.7821538],[139.8060841,35.7821433],[139.8065138,35.7821386],[139.8066149,35.7821408],[139.8069113,35.7820783],[139.8070564,35.7820599],[139.8073749,35.7820642],[139.8080826,35.7820722],[139.8083665,35.7820897],[139.8087426,35.782092],[139.8087846,35.7820811],[139.8089361,35.7820661],[139.8092801,35.7819777],[139.8094956,35.7818732],[139.8102537,35.7816679],[139.8107699,35.7816761],[139.810858,35.7816777],[139.8109434,35.7816829],[139.8115588,35.7816942],[139.8121166,35.7817083],[139.8126529,35.7817376],[139.8135583,35.7817827],[139.8140247,35.7818095],[139.8140888,35.7818137],[139.8141524,35.7818161],[139.8154257,35.7818694],[139.8159905,35.7818898],[139.8160469,35.7818923],[139.8161261,35.7818948],[139.8164267,35.7819044],[139.816776,35.7819165],[139.8170067,35.7819188],[139.8170765,35.7819177],[139.817229,35.7819119],[139.8174875,35.7819052],[139.8176268,35.7819166],[139.8181506,35.7819639],[139.8182698,35.7819727],[139.8186432,35.7820022],[139.8193182,35.7819549],[139.819401,35.781949],[139.8198934,35.7819141],[139.8203674,35.7818805],[139.820866,35.7818396],[139.8209932,35.7818254],[139.8214792,35.7817893],[139.8219775,35.7817533]]},{"id":"101970552","name":"","highway":"tertiary","coordinates":[[139.8140158,35.778573],[139.8140524,35.7786509],[139.8140644,35.7787151],[139.8140668,35.779125],[139.8140701,35.7795187],[139.8140729,35.7799664],[139.8140761,35.780012],[139.8140761,35.7800568],[139.8140763,35.7804486],[139.8140781,35.7808557],[139.8140797,35.7809761],[139.8140803,35.7812645],[139.8140835,35.7813184],[139.8140841,35.781395],[139.8140942,35.7815366],[139.8140888,35.7818137],[139.8140908,35.7818476],[139.8140921,35.782221],[139.8140938,35.7826016],[139.814095,35.7826794],[139.8140954,35.7827408],[139.8140981,35.7831875],[139.8140979,35.7834926],[139.8140979,35.78351],[139.8141065,35.7837297],[139.8141058,35.7838511],[139.8141047,35.7840439],[139.8141035,35.7841039],[139.8141111,35.7843602],[139.814115,35.7846014],[139.8141167,35.7846552]]},{"id":"101970682","name":"環七北通り","highway":"tertiary","coordinates":[[139.8161111,35.7826873],[139.8160523,35.7826871],[139.8155022,35.7826849],[139.8151309,35.7826835],[139.8141645,35.7826797],[139.814095,35.7826794],[139.8140224,35.7826792],[139.8126927,35.782674],[139.8113791,35.7826688],[139.8109185,35.7826671],[139.8107707,35.7826665],[139.8106268,35.7826681],[139.8101951,35.7826728],[139.809226,35.7826835],[139.808775,35.7826885],[139.807337,35.7827043],[139.8065796,35.7827127],[139.8059698,35.7827194],[139.8055958,35.7827235],[139.805363,35.7827261],[139.8047658,35.7827326],[139.8041769,35.7827391],[139.8039259,35.7827398],[139.8036062,35.782737],[139.8031916,35.7827406],[139.803056,35.7827417],[139.8029439,35.7827526]]},{"id":"101971000","name":"","highway":"unclassified","coordinates":[[139.811313,35.7848587],[139.8113298,35.7843505],[139.8113386,35.7840515],[139.8113436,35.7838885],[139.8113474,35.7837472],[139.8113564,35.7834307],[139.8113635,35.7831741],[139.8113791,35.7826688],[139.8113876,35.7826041],[139.8114606,35.7822105],[139.8115588,35.7816942],[139.8115604,35.7812823],[139.8115649,35.7809294],[139.8115648,35.7808833],[139.8115659,35.7808369],[139.81157,35.7804712],[139.8115725,35.7800739],[139.8115728,35.7800274],[139.8115728,35.7800024],[139.8115735,35.7795546],[139.811573,35.7791585]]},{"id":"120112412","name":"","highway":"unclassified","coordinates":[[139.8102734,35.779175],[139.8102535,35.7797248],[139.8102383,35.7800536],[139.8102407,35.7804917],[139.8102484,35.7808959],[139.8102567,35.7812986],[139.8102537,35.7816679],[139.8102526,35.7817064],[139.8102193,35.7821886],[139.8101972,35.7826055],[139.8101951,35.7826728],[139.8101935,35.7827338],[139.8101839,35.7831359],[139.8101664,35.7838719],[139.8101562,35.7843796],[139.8101392,35.7848693],[139.8102176,35.7849197]]},{"id":"120112415","name":"","highway":"unclassified","coordinates":[[139.8127785,35.7847574],[139.8127583,35.7843585],[139.8127562,35.7842059],[139.8127479,35.7840346],[139.81274,35.783857],[139.8127346,35.7837347],[139.8127293,35.7835354],[139.8127238,35.7834342],[139.8127138,35.7831837],[139.8126953,35.7827339],[139.8126927,35.782674],[139.8126905,35.7826086],[139.8126724,35.7822145],[139.8126554,35.7817713],[139.8126529,35.7817376],[139.8126308,35.7812978],[139.8126134,35.7808663],[139.8125949,35.7804618],[139.812582,35.7800274],[139.8125805,35.7799915],[139.8125624,35.7795439],[139.8125489,35.77915],[139.8125347,35.7787545],[139.812548,35.7786599]]},{"id":"120112435","name":"","highway":"unclassified","coordinates":[[139.8102176,35.7849197],[139.8100899,35.784921],[139.8094999,35.7848549],[139.8090205,35.7848011],[139.8089963,35.7846135],[139.8089694,35.7843927],[139.8089615,35.7843191],[139.8089089,35.7838525],[139.80885,35.7833479],[139.8088235,35.7831568],[139.8087835,35.782756],[139.808775,35.7826885],[139.8087426,35.782092],[139.8087219,35.781738],[139.8087149,35.7816152],[139.808703,35.7814069],[139.8086976,35.7812768]]},{"id":"120112438","name":"","highway":"unclassified","coordinates":[[139.8047958,35.7823781],[139.8048035,35.7824078],[139.8048074,35.7825576],[139.8047935,35.7826773],[139.8047922,35.7826885],[139.8047658,35.7827326],[139.8047484,35.7827893],[139.8046725,35.7830366],[139.8046702,35.7830815],[139.8047079,35.7831085],[139.8047331,35.7831288],[139.8048823,35.7833944],[139.8050353,35.7836495]]},{"id":"120112459","name":"","highway":"residential","coordinates":[[139.8044515,35.7825492],[139.8042196,35.7821867],[139.8037978,35.781407]]},{"id":"120112480","name":"","highway":"residential","coordinates":[[139.8065908,35.7834604],[139.8065796,35.7827127],[139.8065675,35.7824282],[139.8065138,35.7821386]]},{"id":"185469846","name":"","highway":"unclassified","coordinates":[[139.8114606,35.7822105],[139.8126724,35.7822145],[139.8140251,35.7822208],[139.8140921,35.782221],[139.8141605,35.7822199],[139.8154226,35.7822292],[139.8154584,35.7822294]]},{"id":"185469899","name":"","highway":"unclassified","coordinates":[[139.8081096,35.7812465],[139.808115,35.7814257],[139.8081123,35.7816257],[139.8081354,35.7817173],[139.8080826,35.7820722]]},{"id":"185469967","name":"","highway":"unclassified","coordinates":[[139.8102193,35.7821886],[139.8093555,35.7821816],[139.809294,35.782009],[139.8092801,35.7819777],[139.8092139,35.7813046],[139.8092132,35.780904],[139.8092206,35.7805045],[139.8092263,35.7801374]]},{"id":"697754220","name":"","highway":"unclassified","coordinates":[[139.8076023,35.7864876],[139.8075244,35.7860577],[139.8074083,35.7854251],[139.8073605,35.7852378],[139.8072886,35.7849259],[139.8072737,35.7848391],[139.8072689,35.7847669],[139.8072578,35.7843441],[139.8072736,35.7839392],[139.8072911,35.7834048],[139.8073029,35.7833387],[139.807337,35.7827043],[139.8073749,35.7820642],[139.8074146,35.7817805],[139.80741,35.7816271],[139.8074273,35.7813634],[139.8074209,35.7813236],[139.8074222,35.7808601],[139.8074251,35.780375],[139.8074324,35.7799772],[139.8073607,35.7794999],[139.8073455,35.7793542],[139.8073011,35.7790953],[139.8072612,35.7787576],[139.8072588,35.7786977]]},{"id":"699519135","name":"","highway":"residential","coordinates":[[139.8092304,35.7831496],[139.8092265,35.7827387],[139.809226,35.7826835]]},{"id":"1409767994","name":"","highway":"residential","coordinates":[[139.8051712,35.7815313],[139.8050499,35.7818735],[139.8048599,35.7823477]]},{"id":"101970529","name":"","highway":"unclassified","coordinates":[[139.8098705,35.7890502],[139.8098922,35.7884327]]},{"id":"101970541","name":"","highway":"tertiary","coordinates":[[139.8164711,35.7844877],[139.8164077,35.7844926],[139.8156874,35.784544],[139.8152852,35.7845793],[139.8145022,35.7846245],[139.8142526,35.7846443],[139.8141677,35.784651],[139.8141167,35.7846552],[139.8140508,35.7846605],[139.8130749,35.7847404],[139.8127785,35.7847574],[139.81237,35.7847755],[139.8119996,35.7847941],[139.811313,35.7848587],[139.8109524,35.7848896],[139.8107762,35.7849004],[139.8106927,35.7849088],[139.8106066,35.7849099],[139.8102714,35.7849166],[139.8102176,35.7849197]]},{"id":"101970701","name":"","highway":"unclassified","coordinates":[[139.8099819,35.7883935],[139.8099837,35.7883489],[139.810039,35.7875102]]},{"id":"101970783","name":"","highway":"tertiary","coordinates":[[139.8028598,35.7889213],[139.8029242,35.7889232],[139.8041267,35.7888573],[139.804263,35.7888501],[139.8044485,35.78884],[139.8047827,35.7888339],[139.8053516,35.7888478],[139.805433,35.7888552],[139.8055119,35.7888644],[139.8055593,35.7888701],[139.805644,35.7889],[139.805692,35.7889079],[139.8058473,35.7889333],[139.8067457,35.7889692],[139.8069368,35.7889504],[139.8071174,35.7889611],[139.8075137,35.7890091],[139.8077381,35.7890339],[139.8080342,35.7890499],[139.8084372,35.7890634],[139.8086213,35.7890688],[139.8087961,35.789074],[139.8088602,35.7890765],[139.8089192,35.7890736],[139.8089582,35.7890634],[139.8089927,35.789045],[139.8090109,35.7890282],[139.8090253,35.7890106],[139.8090224,35.7889704],[139.8089996,35.7889071],[139.8089502,35.7887921],[139.808924,35.7887276],[139.8089095,35.788655],[139.808913,35.7885982],[139.8089274,35.7885377],[139.8089659,35.7884446],[139.8089993,35.7883649],[139.8090265,35.7882999],[139.8090869,35.7881743],[139.8091588,35.7880286],[139.8092265,35.7878649],[139.8092593,35.7877826],[139.8093349,35.7875981],[139.8093553,35.7875478],[139.8094517,35.7872989],[139.8095348,35.7870845],[139.8095684,35.7869958],[139.8096071,35.7868848],[139.809729,35.7864452],[139.8097835,35.7862627],[139.8098635,35.7860423],[139.8102037,35.7849802],[139.8102176,35.7849197]]},{"id":"101970893","name":"","highway":"unclassified","coordinates":[[139.8120012,35.7873682],[139.8127558,35.7873058],[139.8132083,35.787274],[139.814455,35.7871734],[139.8157348,35.7870717],[139.816296,35.7870314],[139.8165645,35.7870136],[139.8166434,35.7870082],[139.8167159,35.786999],[139.8173178,35.7869494],[139.8177968,35.7869202],[139.818207,35.7868875],[139.818834,35.7868404],[139.8193575,35.786801],[139.8198316,35.7867566],[139.8198741,35.7867526],[139.8199285,35.7867483],[139.8202773,35.7867209],[139.8208495,35.78668],[139.8209121,35.7866755],[139.8209765,35.7866706],[139.8213777,35.7866404],[139.8219022,35.7866006],[139.8220203,35.7865898],[139.8221438,35.7865808],[139.8224569,35.7865568],[139.8226861,35.7865393],[139.8230824,35.7865113],[139.8239911,35.7863489],[139.8240789,35.7863356],[139.8241246,35.7863276],[139.8246374,35.7862318],[139.8251434,35.7861372],[139.8259661,35.7859835],[139.8263825,35.785921]]},{"id":"101970961","name":"","highway":"unclassified","coordinates":[[139.8161734,35.7831439],[139.8161166,35.7831452],[139.8155502,35.7831451],[139.8155107,35.7831462],[139.8151408,35.7831558],[139.8140981,35.7831875],[139.8127138,35.7831837],[139.8114034,35.7831728],[139.8113635,35.7831741]]},{"id":"101971034","name":"","highway":"unclassified","coordinates":[[139.8141677,35.784651],[139.814172,35.7846958],[139.8141918,35.7848903],[139.8142362,35.7852398],[139.8142404,35.7852748],[139.8142643,35.7854821],[139.8142846,35.7856578],[139.8143102,35.7859371],[139.814455,35.7871734],[139.8145184,35.7877526],[139.8145216,35.7877818],[139.8144873,35.7880608],[139.8144681,35.7882223],[139.8144395,35.7885692],[139.8144204,35.7887848],[139.81439,35.7891265],[139.8143847,35.7891863],[139.8143789,35.7892533],[139.8143453,35.7896415],[139.8143411,35.7897028],[139.8143374,35.7897423],[139.814301,35.7901103],[139.8142215,35.7910476],[139.814217,35.7911011]]},{"id":"102170126","name":"","highway":"unclassified","coordinates":[[139.8113391,35.7878674],[139.8113267,35.7880767],[139.8112932,35.788483],[139.8112467,35.7889446],[139.8111978,35.7894944],[139.8111924,35.7895552],[139.811161,35.7899168],[139.8110731,35.7909267],[139.8109749,35.7920926],[139.8109357,35.7925427]]},{"id":"102170466","name":"","highway":"residential","coordinates":[[139.8067457,35.7889692],[139.8067173,35.7894242],[139.806709,35.789488],[139.8067023,35.7895509],[139.8066537,35.7900974],[139.8066021,35.7906692]]},{"id":"120112401","name":"","highway":"unclassified","coordinates":[[139.8130749,35.7847404],[139.8131063,35.7852919],[139.8131152,35.7854971],[139.8131406,35.7860242],[139.8132083,35.787274],[139.8132282,35.7876549],[139.8132291,35.7877676],[139.8132295,35.7878135]]},{"id":"120112404","name":"","highway":"unclassified","coordinates":[[139.809729,35.7864452],[139.8096782,35.7864375],[139.8095118,35.7864348],[139.8091345,35.7864267],[139.8087566,35.7864788],[139.8086512,35.7864929],[139.8082452,35.7864976]]},{"id":"120112405","name":"","highway":"unclassified","coordinates":[[139.8094999,35.7848549],[139.8095029,35.7843858],[139.809504,35.7838675],[139.8095037,35.7831447]]},{"id":"120112419","name":"","highway":"unclassified","coordinates":[[139.8118257,35.7894778],[139.8118309,35.7894148],[139.8118761,35.7888707],[139.8119405,35.788104],[139.8119795,35.7876701],[139.8120016,35.7876477],[139.8120014,35.787635],[139.8120012,35.7873682]]},{"id":"120112427","name":"","highway":"unclassified","coordinates":[[139.8058594,35.7835232],[139.8058385,35.7844085],[139.8058238,35.7850351],[139.8056183,35.7852242],[139.8056059,35.7852784],[139.8055141,35.7861281]]},{"id":"120112437","name":"","highway":"unclassified","coordinates":[[139.8097835,35.7862627],[139.8098464,35.7862731],[139.8104587,35.7862286],[139.8105235,35.7862239],[139.8105756,35.7862201],[139.8106477,35.7862167],[139.8107331,35.7862093],[139.810844,35.7861995],[139.8108857,35.7861963],[139.8119984,35.7861117],[139.8124496,35.7860803],[139.8131406,35.7860242],[139.8143102,35.7859371],[139.8154212,35.7858569],[139.8159067,35.7858142],[139.8162302,35.7857858],[139.8162974,35.7857812],[139.816376,35.7857755],[139.8170542,35.785731],[139.8173071,35.7857144],[139.8176526,35.7856875],[139.8176794,35.785683]]},{"id":"120112439","name":"","highway":"unclassified","coordinates":[[139.805564,35.7861319],[139.8055657,35.786539],[139.8055838,35.7865713],[139.8055614,35.7874237],[139.8055609,35.7874364],[139.8055557,35.7876956],[139.8055542,35.7879468],[139.8055546,35.7887641],[139.8055534,35.788806],[139.8055593,35.7888701]]},{"id":"120112449","name":"","highway":"unclassified","coordinates":[[139.8072736,35.7839392],[139.807966,35.783902],[139.808462,35.7838753],[139.8085236,35.7838708],[139.8088633,35.7838491],[139.8089089,35.7838525],[139.808959,35.7838614],[139.809504,35.7838675],[139.8101664,35.7838719],[139.8106399,35.7838814],[139.810727,35.7838833],[139.8108131,35.7838832],[139.8113436,35.7838885]]},{"id":"120112450","name":"","highway":"residential","coordinates":[[139.8075137,35.7890091],[139.807479,35.7886312],[139.8074682,35.7885088],[139.8074593,35.788432],[139.8074465,35.7883621],[139.8073942,35.788112],[139.8073412,35.7878431],[139.8072594,35.7878068],[139.8072155,35.7877773]]},{"id":"120112454","name":"","highway":"unclassified","coordinates":[[139.8058385,35.7844085],[139.8072578,35.7843441]]},{"id":"120112458","name":"","highway":"unclassified","coordinates":[[139.8101839,35.7831359],[139.8095037,35.7831447],[139.8092304,35.7831496],[139.8088235,35.7831568]]},{"id":"120145934","name":"","highway":"unclassified","coordinates":[[139.8086614,35.7861997],[139.8082299,35.7862525],[139.8081826,35.7862396],[139.808151,35.7862082],[139.8081323,35.786023],[139.8081302,35.7860024],[139.8080582,35.7859613]]},{"id":"120146031","name":"","highway":"unclassified","coordinates":[[139.8041048,35.7873784],[139.8041969,35.7877179],[139.8043031,35.7881208],[139.8044485,35.78884]]},{"id":"120146037","name":"","highway":"unclassified","coordinates":[[139.8120041,35.7853259],[139.812401,35.7853116],[139.8131063,35.7852919]]},{"id":"120146055","name":"","highway":"unclassified","coordinates":[[139.8131152,35.7854971],[139.8120018,35.7855353]]},{"id":"120146087","name":"","highway":"unclassified","coordinates":[[139.8109524,35.7848896],[139.8109487,35.7849362],[139.8109323,35.7851388],[139.8109114,35.7853952],[139.8108478,35.7861543],[139.810844,35.7861995],[139.81084,35.7862426],[139.810773,35.7869663],[139.8107374,35.787417],[139.8107337,35.7874644]]},{"id":"120146104","name":"","highway":"unclassified","coordinates":[[139.812401,35.7853116],[139.81237,35.7847755]]},{"id":"120146106","name":"","highway":"unclassified","coordinates":[[139.8092379,35.7863083],[139.8092984,35.7863223],[139.8095118,35.7864348]]},{"id":"120146120","name":"","highway":"unclassified","coordinates":[[139.8074083,35.7854251],[139.8077579,35.7854051],[139.8080965,35.7853755],[139.8083361,35.7853604],[139.80899,35.7853133],[139.808993,35.7856325],[139.8090574,35.7857269],[139.809055,35.7858739],[139.8090528,35.7860151],[139.8092379,35.7863083],[139.8091345,35.7864267]]},{"id":"149313059","name":"","highway":"unclassified","coordinates":[[139.8101562,35.7843796],[139.8095029,35.7843858],[139.8089694,35.7843927]]},{"id":"150437960","name":"","highway":"unclassified","coordinates":[[139.8082452,35.7864976],[139.8082438,35.786611],[139.8082861,35.7867413],[139.8082969,35.7867748],[139.8083071,35.7868268],[139.8083434,35.7868844],[139.8083778,35.7869332],[139.8084377,35.7870537],[139.8084734,35.787125],[139.8085444,35.7872465],[139.8086018,35.7873073],[139.8085958,35.7873738],[139.8085968,35.7874475],[139.8086086,35.7875517],[139.8086421,35.7876158],[139.8086582,35.7876295],[139.8088571,35.7876248],[139.8088676,35.7876364],[139.8088784,35.7877018],[139.8089168,35.787738],[139.8091949,35.787766],[139.8092593,35.7877826]]},{"id":"183398108","name":"","highway":"residential","coordinates":[[139.804263,35.7888501],[139.8042568,35.7889152],[139.8042116,35.789332],[139.8042054,35.7893912]]},{"id":"185469637","name":"","highway":"unclassified","coordinates":[[139.8141035,35.7841039],[139.8127562,35.7842059]]},{"id":"185469717","name":"","highway":"unclassified","coordinates":[[139.8144781,35.7837114],[139.8144868,35.7842422],[139.8145022,35.7846245]]},{"id":"185469795","name":"","highway":"unclassified","coordinates":[[139.8144868,35.7842422],[139.8148297,35.7842148],[139.8156495,35.7841579],[139.8163261,35.7841124],[139.8163845,35.7841074]]},{"id":"199424463","name":"","highway":"unclassified","coordinates":[[139.8030179,35.7838029],[139.8030876,35.7838187],[139.8034739,35.7839064],[139.8035107,35.7839119],[139.8036822,35.7839337],[139.8041026,35.7839446],[139.8042474,35.7839576],[139.8042602,35.7839587],[139.8042858,35.7839448],[139.8045675,35.7838239],[139.8047938,35.7837362],[139.8050353,35.7836495],[139.805204,35.7835891],[139.8054017,35.7835117],[139.8055467,35.7835052],[139.8058594,35.7835232],[139.8065908,35.7834604],[139.8072911,35.7834048],[139.8078877,35.7833994],[139.808097,35.7834134],[139.8081625,35.7833952],[139.8082959,35.7834002],[139.808405,35.78339],[139.80885,35.7833479]]},{"id":"205858894","name":"","highway":"unclassified","coordinates":[[139.8144681,35.7882223],[139.8131946,35.7881614],[139.812192,35.7881146],[139.8119405,35.788104],[139.8113267,35.7880767]]},{"id":"251771254","name":"","highway":"residential","coordinates":[[139.8051868,35.7881884],[139.8050353,35.7874221]]},{"id":"251771256","name":"","highway":"residential","coordinates":[[139.8113756,35.7854245],[139.8113965,35.7851743]]},{"id":"251771278","name":"","highway":"residential","coordinates":[[139.8109323,35.7851388],[139.8113965,35.7851743],[139.8115283,35.7851844]]},{"id":"251771295","name":"","highway":"residential","coordinates":[[139.8109114,35.7853952],[139.8113756,35.7854245],[139.8115506,35.7854356],[139.8120009,35.7854422]]},{"id":"251771310","name":"","highway":"residential","coordinates":[[139.8084372,35.7890634],[139.8084039,35.7886745],[139.8084003,35.7885751],[139.8084454,35.7885768],[139.8085491,35.7885897],[139.8086969,35.7885978],[139.808913,35.7885982]]},{"id":"280180591","name":"","highway":"residential","coordinates":[[139.8169053,35.7883146],[139.8168489,35.7883173],[139.8168041,35.7883194],[139.8163361,35.7883417],[139.8157187,35.7884102],[139.8151389,35.7884821],[139.8144395,35.7885692],[139.8131363,35.7887207],[139.8118761,35.7888707],[139.8112467,35.7889446],[139.8106533,35.7890649],[139.8105674,35.789076],[139.81049,35.7890841]]},{"id":"311913033","name":"","highway":"unclassified","coordinates":[[139.8028567,35.7859173],[139.8029669,35.7859187],[139.8030323,35.785925],[139.8032243,35.7859484],[139.8034325,35.7859763],[139.8038739,35.7860367],[139.804056,35.7860613],[139.8044044,35.7860767],[139.8047649,35.7860933],[139.8055141,35.7861281],[139.805564,35.7861319],[139.8060215,35.7861709],[139.8062272,35.786177],[139.8065651,35.7861708],[139.8068707,35.7861494],[139.807196,35.7861028],[139.8075244,35.7860577],[139.8075825,35.78604],[139.8078353,35.7860029],[139.807994,35.7859803],[139.8080582,35.7859613],[139.8081042,35.7859275],[139.8082019,35.7858469],[139.8086272,35.785818],[139.8086674,35.7858706],[139.8086614,35.7861997],[139.8087033,35.786219],[139.8087305,35.7862448],[139.8087566,35.7864788]]},{"id":"313774227","name":"","highway":"unclassified","coordinates":[[139.8120012,35.7873682],[139.8120016,35.7869961],[139.8120007,35.7868715],[139.8119991,35.7866338],[139.8119984,35.7865309],[139.8119992,35.7863256],[139.8119984,35.7861117],[139.8120018,35.7855353],[139.8120009,35.7854422],[139.8120041,35.7853259],[139.8119996,35.7847941]]},{"id":"626095372","name":"","highway":"unclassified","coordinates":[[139.8084377,35.7870537],[139.8083785,35.7870649],[139.8082146,35.7871183],[139.8080486,35.7871995],[139.808025,35.7872119],[139.8079428,35.7872432],[139.8078881,35.7872615],[139.807729,35.7872997],[139.8075149,35.7873204],[139.8073718,35.7873321],[139.8073095,35.7873354],[139.8072979,35.787336],[139.8069623,35.787335],[139.8067927,35.7873205],[139.8066838,35.7873109],[139.8065439,35.7873039],[139.8064103,35.7873107],[139.8062538,35.7873395],[139.8062247,35.7873486],[139.8061423,35.7873816],[139.8060833,35.7874047],[139.8058154,35.7874552],[139.8055614,35.7874237]]},{"id":"673554582","name":"","highway":"unclassified","coordinates":[[139.8132196,35.7878136],[139.8132095,35.7879676],[139.8131946,35.7881614],[139.8131363,35.7887207],[139.8131022,35.789269],[139.8130981,35.7893342]]},{"id":"697541066","name":"","highway":"unclassified","coordinates":[[139.8141065,35.7837297],[139.8144781,35.7837114],[139.8155985,35.7836557],[139.8162215,35.783612],[139.816275,35.7836093]]},{"id":"697567362","name":"","highway":"residential","coordinates":[[139.8055542,35.7879468],[139.8056257,35.7879465],[139.805729,35.787946],[139.8058327,35.787951],[139.8059103,35.7879644],[139.8059843,35.7879902],[139.8060475,35.788021],[139.8061083,35.7880596],[139.8062615,35.7881756],[139.8063184,35.7882248],[139.8063661,35.7882837],[139.8064003,35.7883482],[139.8064287,35.7884357],[139.806448,35.7885067],[139.8064848,35.7885616],[139.8065381,35.7886035],[139.8065998,35.7886323],[139.8068911,35.7887193],[139.8069335,35.7887276]]},{"id":"697567363","name":"","highway":"residential","coordinates":[[139.8069368,35.7889504],[139.8069382,35.7889028],[139.8069335,35.7887276],[139.8069232,35.7885169],[139.8069,35.7883328],[139.8068988,35.7882889],[139.8069025,35.7882402],[139.80691,35.7881974],[139.8069496,35.7880805],[139.8069828,35.7880181],[139.8070272,35.7879571],[139.8070799,35.7878936],[139.8071644,35.7878205],[139.8072155,35.7877773],[139.8072714,35.7877129],[139.8073019,35.7876657],[139.8073252,35.7876182],[139.8073452,35.7875517],[139.8073553,35.7874893],[139.8073633,35.7874315],[139.8073672,35.7873858],[139.8073718,35.7873321]]},{"id":"697567364","name":"","highway":"unclassified","coordinates":[[139.8055609,35.7874364],[139.8053421,35.7874364],[139.8050353,35.7874221],[139.8047197,35.7874018],[139.8045542,35.7873855],[139.8043792,35.7873752],[139.8041048,35.7873784],[139.8036536,35.7874068],[139.8034401,35.7874063],[139.8032286,35.7874028],[139.8029843,35.787394],[139.802907,35.7873753]]},{"id":"697567365","name":"","highway":"residential","coordinates":[[139.8073412,35.7878431],[139.8076197,35.7878295],[139.8078408,35.7878202],[139.808111,35.7878081],[139.8081849,35.7877909],[139.8082245,35.7878127],[139.8082821,35.7879428],[139.808282,35.7879693],[139.8082725,35.7879916],[139.8082545,35.788016],[139.8082373,35.7880401],[139.8082268,35.788069],[139.8082229,35.7880981],[139.8082252,35.7881302],[139.8082512,35.7882327],[139.8082552,35.788264],[139.808249,35.7882949],[139.8082321,35.7883193],[139.8082136,35.7883375],[139.8081848,35.788352],[139.8081452,35.7883594],[139.807983,35.7883623],[139.8078408,35.7878202]]},{"id":"697567366","name":"","highway":"residential","coordinates":[[139.805729,35.787946],[139.805728,35.7877213],[139.8057281,35.7875872],[139.8058946,35.7875842],[139.8059965,35.7875747],[139.8061101,35.787554],[139.8062042,35.7875238],[139.806281,35.7874953],[139.8063035,35.7874864],[139.806364,35.7874699],[139.8064404,35.7874612],[139.8066297,35.7874513],[139.8067337,35.7874535],[139.8068225,35.7874656],[139.8069125,35.7874736],[139.806995,35.7874785],[139.8071462,35.7874822],[139.8073098,35.7874878],[139.8073553,35.7874893]]},{"id":"697567367","name":"","highway":"residential","coordinates":[[139.805728,35.7877213],[139.8059419,35.7877223],[139.8060319,35.7877306],[139.8061141,35.7877511],[139.8061896,35.787783],[139.8062575,35.7878267],[139.8063723,35.7879155],[139.8064369,35.7879666],[139.806514,35.7880277],[139.8065403,35.7880446],[139.806581,35.7880748],[139.8066671,35.7881191],[139.8068291,35.7881789],[139.8068684,35.7881879],[139.80691,35.7881974]]},{"id":"697567368","name":"","highway":"residential","coordinates":[[139.8064369,35.7879666],[139.806552,35.7879027],[139.8066109,35.7878717],[139.8066634,35.787848],[139.806711,35.7878359],[139.8067846,35.7878335],[139.8068716,35.7878406],[139.8069408,35.7878499],[139.807015,35.7878632],[139.8070476,35.7878785],[139.8070799,35.7878936]]},{"id":"697567369","name":"","highway":"residential","coordinates":[[139.8068988,35.7882889],[139.8071196,35.788276],[139.8071565,35.7882678],[139.8071923,35.7882496],[139.8072178,35.7882247],[139.8072377,35.7881901],[139.8072517,35.7881613],[139.8072694,35.7881379],[139.8072958,35.7881253],[139.8073942,35.788112]]},{"id":"706248428","name":"","highway":"unclassified","coordinates":[[139.8145216,35.7877818],[139.8144668,35.7877922],[139.8143181,35.7877983],[139.8140285,35.7878122],[139.8132295,35.7878135],[139.8132196,35.7878136],[139.8131717,35.7878103],[139.812983,35.78777],[139.8128251,35.7877386],[139.8125975,35.7877029],[139.8124802,35.7876923],[139.8122707,35.7876733],[139.8122235,35.7876718],[139.8120069,35.7876699],[139.8119795,35.7876701],[139.8118241,35.7876692],[139.8116822,35.7877237],[139.8113391,35.7878674],[139.8106817,35.7881185],[139.8105946,35.7881514],[139.8105031,35.7881899],[139.8102867,35.7882743],[139.8099819,35.7883935],[139.8098922,35.7884327],[139.8095893,35.7885616],[139.8094519,35.7885956],[139.8092635,35.7886687],[139.8090948,35.7887307],[139.8089502,35.7887921]]},{"id":"706248429","name":"","highway":"residential","coordinates":[[139.8112932,35.788483],[139.8112312,35.7884816],[139.8111501,35.7884797],[139.8107287,35.7884698],[139.8106515,35.788468],[139.8105851,35.7884665]]},{"id":"1104076554","name":"","highway":"tertiary","coordinates":[[139.8054016,35.7894375],[139.8054093,35.7893737],[139.8054402,35.7889197],[139.805433,35.7888552]]},{"id":"1226728018","name":"","highway":"unclassified","coordinates":[[139.8093553,35.7875478],[139.8093999,35.7875601],[139.8094249,35.7875631],[139.8094777,35.7875594],[139.810039,35.7875102],[139.8102362,35.7874984],[139.8105314,35.7874808],[139.8106094,35.7874752],[139.8106919,35.7874676],[139.8107337,35.7874644],[139.8120012,35.7873682]]},{"id":"1320971975","name":"","highway":"residential","coordinates":[[139.8102362,35.7874984],[139.8102292,35.7874691],[139.8102546,35.7871648]]},{"id":"1320971976","name":"","highway":"residential","coordinates":[[139.8089993,35.7883649],[139.8089417,35.788357],[139.808563,35.7883405],[139.8085745,35.7882085]]},{"id":"1320971980","name":"","highway":"residential","coordinates":[[139.8051327,35.7881902],[139.8051868,35.7881884],[139.8052415,35.7881866]]},{"id":"101970582","name":"舎人公園通り","highway":"tertiary","coordinates":[[139.8068982,35.7948361],[139.8075241,35.794847],[139.8084266,35.7948672],[139.8087554,35.7948758],[139.8092164,35.7948992],[139.8094173,35.7949088],[139.8099068,35.7949297],[139.8100871,35.7949355],[139.8102769,35.7949425],[139.8107281,35.7949617],[139.8119784,35.7950161],[139.8123831,35.7950344],[139.8125951,35.7950303],[139.8127333,35.7950287],[139.8129156,35.7950134],[139.8130676,35.7949959],[139.8132383,35.7949647],[139.8133338,35.7949477],[139.8139008,35.7948214],[139.8145398,35.7946751],[139.8156783,35.7944133],[139.815735,35.7944002],[139.8161866,35.7942957],[139.816351,35.7942608],[139.8166136,35.7942052],[139.8168426,35.7941568],[139.8169814,35.7941163],[139.8170959,35.7940855],[139.8182623,35.7938203],[139.8189193,35.7936723],[139.8194206,35.7935598],[139.8195041,35.7935411],[139.8196014,35.7935191],[139.8208085,35.7932457],[139.821421,35.7931107],[139.8220185,35.7929811],[139.8221908,35.7929251]]},{"id":"101970688","name":"","highway":"residential","coordinates":[[139.8098859,35.7895959],[139.8098827,35.789654],[139.8098789,35.7896979],[139.8098275,35.7902843],[139.8097858,35.790764],[139.809778,35.7908453],[139.8097701,35.7909254],[139.8097271,35.7913626],[139.8096691,35.7920054]]},{"id":"101970773","name":"","highway":"tertiary","coordinates":[[139.8138139,35.7927151],[139.8140824,35.7927309],[139.8146963,35.7927598],[139.8151821,35.7927868],[139.8154381,35.792801],[139.8157119,35.7928162],[139.8158082,35.7928219],[139.8158848,35.7928265],[139.8162937,35.7928508],[139.8168997,35.7928872],[139.8169973,35.7928935]]},{"id":"101970988","name":"","highway":"tertiary","coordinates":[[139.817,35.7912681],[139.8169376,35.7912658],[139.8159242,35.7912047],[139.8158611,35.7912009],[139.8158079,35.7911977],[139.8142979,35.791106],[139.814217,35.7911011],[139.8141533,35.7910975],[139.8136184,35.7910673],[139.813059,35.7910357],[139.8129896,35.7910318],[139.8126063,35.7910126],[139.8110731,35.7909267],[139.8105373,35.7908941],[139.8104378,35.7908826],[139.8103555,35.7908739],[139.809778,35.7908453],[139.8091741,35.7908105],[139.8087994,35.7907924],[139.8084991,35.790774],[139.8078885,35.7907463],[139.807221,35.7907072],[139.8066021,35.7906692],[139.8063427,35.7906529],[139.8053819,35.7905871],[139.8053023,35.7905816],[139.8052245,35.7905749],[139.8046899,35.7905392],[139.8034668,35.7904669],[139.8028056,35.7904246],[139.8027269,35.7904215]]},{"id":"101971008","name":"","highway":"unclassified","coordinates":[[139.8090253,35.7890106],[139.8090853,35.7890147],[139.8091333,35.7890172],[139.809129,35.7891195],[139.8091059,35.7894726],[139.8091026,35.7895222],[139.8090991,35.7895747]]},{"id":"102170113","name":"","highway":"residential","coordinates":[[139.8074925,35.7951516],[139.8071856,35.7951367],[139.8068826,35.7951031],[139.8068237,35.7950988],[139.8055399,35.795005],[139.8049024,35.7949677],[139.804687,35.7949436],[139.8044717,35.7949151],[139.8043982,35.7948836],[139.8043622,35.7948525],[139.8042983,35.7947973],[139.8043028,35.7947469],[139.8043407,35.7943251],[139.8043815,35.7938562],[139.8044234,35.7934053],[139.8044798,35.792801],[139.8044864,35.7927306]]},{"id":"102170162","name":"","highway":"tertiary","coordinates":[[139.8049132,35.7974494],[139.8050341,35.7971445],[139.8050529,35.7971069],[139.8050717,35.7970694],[139.8051039,35.7970191],[139.805213,35.7965086],[139.805369,35.7957698],[139.805465,35.7953631],[139.8055399,35.795005],[139.8055435,35.7949768],[139.8055568,35.7948733],[139.8055642,35.7948154]]},{"id":"102170181","name":"","highway":"residential","coordinates":[[139.8024323,35.7937383],[139.8025035,35.7937423],[139.8031816,35.7937788],[139.8043815,35.7938562],[139.8056346,35.7939319],[139.8069423,35.794011],[139.8076004,35.7940458],[139.8084969,35.7941001],[139.8085385,35.7941023],[139.8094723,35.7941526]]},{"id":"102170241","name":"","highway":"unclassified","coordinates":[[139.8083834,35.7953755],[139.8084221,35.7949209],[139.8084266,35.7948672],[139.8084317,35.7948112],[139.8084639,35.7944544],[139.8084969,35.7941001],[139.8085468,35.7936261],[139.8085796,35.7932231],[139.808617,35.7928188],[139.8086544,35.7924128],[139.8086928,35.7919401]]},{"id":"102170249","name":"","highway":"unclassified","coordinates":[[139.8069651,35.7935493],[139.8069423,35.794011],[139.8068962,35.7944843],[139.8068759,35.7947704],[139.8068756,35.7947818],[139.806874,35.7948357]]},{"id":"102170289","name":"","highway":"unclassified","coordinates":[[139.8108267,35.7937614],[139.8102811,35.7937268],[139.8101918,35.7937238],[139.8101049,35.7937201],[139.8095201,35.7936859],[139.8085804,35.7936282],[139.8085468,35.7936261],[139.8076398,35.7935824],[139.8069651,35.7935493],[139.8064365,35.7935159],[139.8055793,35.7934618],[139.8044234,35.7934053],[139.8032219,35.7933238]]},{"id":"102170437","name":"","highway":"unclassified","coordinates":[[139.8108775,35.8008665],[139.8108694,35.8008124],[139.8108031,35.8003668],[139.8107494,35.7999639],[139.8106789,35.7994348],[139.8106718,35.7993818],[139.8106719,35.7993397],[139.8106737,35.7988404],[139.8106669,35.7982542],[139.8106663,35.7982014],[139.8106715,35.798159],[139.810718,35.7977829],[139.8107767,35.7972656],[139.810781,35.7972274],[139.8107642,35.7963301],[139.8107458,35.7957271],[139.8107406,35.7954543],[139.8107281,35.7949617],[139.8107628,35.7944489],[139.8108093,35.7939769],[139.8108267,35.7937614],[139.8108449,35.7935682],[139.8108865,35.7930709],[139.8109357,35.7925427]]},{"id":"102170515","name":"","highway":"residential","coordinates":[[139.8074403,35.7958236],[139.8074757,35.7953475],[139.8074925,35.7951516],[139.8074957,35.7951203],[139.8075192,35.7948946],[139.8075241,35.794847],[139.8075285,35.7947905],[139.8075602,35.7944754],[139.8075678,35.7943967],[139.8076004,35.7940458],[139.8076398,35.7935824],[139.8076735,35.7931614],[139.8077156,35.7927659],[139.8077577,35.7923707],[139.8077989,35.7918804],[139.8078885,35.7907463],[139.8079348,35.790171],[139.8079854,35.7895859],[139.80799,35.7895331],[139.8079948,35.7894801],[139.8080342,35.7890499]]},{"id":"102170545","name":"","highway":"tertiary","coordinates":[[139.8048234,35.7925487],[139.8049098,35.7924746],[139.8049884,35.7923947],[139.8050514,35.792311],[139.805101,35.7922229],[139.8051407,35.7921324],[139.8051721,35.7920314],[139.8051893,35.7919389],[139.8052116,35.7917076],[139.8052344,35.7913697],[139.8052529,35.7911782],[139.805298,35.7906513],[139.8053023,35.7905816],[139.8053082,35.7905121],[139.8053532,35.7900148],[139.8053947,35.7894969],[139.8054016,35.7894375]]},{"id":"120112451","name":"","highway":"unclassified","coordinates":[[139.8129896,35.7910318],[139.8129857,35.7910675],[139.8129806,35.7911151],[139.8128138,35.7926541]]},{"id":"120112452","name":"","highway":"unclassified","coordinates":[[139.8126063,35.7910126],[139.812644,35.7906839],[139.8126762,35.7904031],[139.8126832,35.7902067],[139.8126863,35.7901744],[139.8127023,35.7900083],[139.812718,35.7899847],[139.8127253,35.7898797],[139.8127565,35.7894344],[139.8127609,35.7893717]]},{"id":"120112455","name":"","highway":"unclassified","coordinates":[[139.8133297,35.7936468],[139.8133658,35.7932872],[139.8133741,35.7932044],[139.813417,35.7926916]]},{"id":"120112474","name":"","highway":"unclassified","coordinates":[[139.8146141,35.7937606],[139.8140355,35.7937223],[139.8139856,35.7937117],[139.8139336,35.7937034],[139.8133297,35.7936468],[139.8132833,35.7936484],[139.8127031,35.7936763],[139.8120942,35.7936379],[139.8108449,35.7935682]]},{"id":"120112481","name":"","highway":"unclassified","coordinates":[[139.8140824,35.7927309],[139.8138837,35.7931414],[139.8138727,35.7932],[139.8138791,35.7932741],[139.8138887,35.7933142],[139.8139075,35.7933715],[139.81397,35.7935334],[139.8139857,35.7935958],[139.8139856,35.7937117],[139.8139363,35.7942765],[139.8138957,35.7947321],[139.8139008,35.7948214]]},{"id":"120112482","name":"","highway":"unclassified","coordinates":[[139.8121833,35.7926159],[139.8121337,35.7931445],[139.8120942,35.7936379],[139.8120584,35.7940497],[139.8120283,35.7943943],[139.8119784,35.7950161]]},{"id":"120112489","name":"","highway":"unclassified","coordinates":[[139.8108865,35.7930709],[139.8121337,35.7931445],[139.8133741,35.7932044]]},{"id":"183398103","name":"","highway":"residential","coordinates":[[139.8052529,35.7911782],[139.8053305,35.791181],[139.8059159,35.7912241],[139.8071714,35.7913042]]},{"id":"183398104","name":"","highway":"residential","coordinates":[[139.8052116,35.7917076],[139.8052857,35.7917126],[139.8053806,35.7917189],[139.8071191,35.791835],[139.8077989,35.7918804],[139.8084048,35.7919209],[139.8086928,35.7919401],[139.8090729,35.7919655],[139.8091358,35.7919697],[139.8096691,35.7920054],[139.8102633,35.7920451],[139.8103404,35.7920502],[139.8104268,35.792056],[139.8109749,35.7920926]]},{"id":"183398107","name":"","highway":"residential","coordinates":[[139.8071191,35.791835],[139.8071714,35.7913042],[139.807221,35.7907072]]},{"id":"183398109","name":"","highway":"residential","coordinates":[[139.8035201,35.7899061],[139.8047352,35.7899712]]},{"id":"184746653","name":"","highway":"unclassified","coordinates":[[139.8157183,35.7938681],[139.8145836,35.7941344],[139.8139971,35.7942707],[139.8139363,35.7942765],[139.8133281,35.7943047],[139.8132665,35.794314],[139.8130169,35.7943551],[139.8126494,35.794367],[139.8120283,35.7943943],[139.8107628,35.7944489]]},{"id":"184746681","name":"","highway":"unclassified","coordinates":[[139.8108093,35.7939769],[139.8120584,35.7940497]]},{"id":"184746682","name":"","highway":"unclassified","coordinates":[[139.8132665,35.794314],[139.8132155,35.794889],[139.8132383,35.7949647]]},{"id":"184746694","name":"","highway":"residential","coordinates":[[139.8036289,35.7947847],[139.8036021,35.7948436],[139.8034688,35.7951361],[139.8032632,35.7955645],[139.8030222,35.7960714],[139.8033603,35.7962678],[139.8040827,35.7966876]]},{"id":"184746695","name":"","highway":"residential","coordinates":[[139.8049024,35.7949677],[139.8046403,35.7953075],[139.8046131,35.7955216]]},{"id":"184746698","name":"","highway":"unclassified","coordinates":[[139.809593,35.7928746],[139.8086513,35.7928208],[139.808617,35.7928188],[139.8077156,35.7927659]]},{"id":"184746702","name":"","highway":"residential","coordinates":[[139.8094478,35.7945098],[139.8085051,35.7944567],[139.8084639,35.7944544],[139.8075678,35.7943967]]},{"id":"184746705","name":"","highway":"unclassified","coordinates":[[139.8076735,35.7931614],[139.8085796,35.7932231],[139.8086133,35.7932249],[139.8095568,35.7932746]]},{"id":"184746707","name":"","highway":"unclassified","coordinates":[[139.8125951,35.7950303],[139.8126494,35.794367],[139.812684,35.7939606],[139.8127031,35.7936763]]},{"id":"184746717","name":"","highway":"unclassified","coordinates":[[139.8133658,35.7932872],[139.8138887,35.7933142],[139.8139574,35.7933215],[139.8146489,35.7933558],[139.8156943,35.7934075],[139.815764,35.793411]]},{"id":"184746726","name":"","highway":"residential","coordinates":[[139.8094173,35.7949088],[139.8094217,35.7948516],[139.8094478,35.7945098],[139.8094723,35.7941526],[139.8095201,35.7936859],[139.8095568,35.7932746],[139.809593,35.7928746],[139.8096242,35.7925125],[139.8096285,35.7924626]]},{"id":"221559408","name":"","highway":"residential","coordinates":[[139.8091741,35.7908105],[139.8091659,35.7909036],[139.8090729,35.7919655]]},{"id":"221559409","name":"","highway":"residential","coordinates":[[139.8088958,35.7895672],[139.8088911,35.7896225],[139.8088444,35.7902234],[139.8088275,35.7904491],[139.8088048,35.7906972],[139.8087994,35.7907924]]},{"id":"221559410","name":"","highway":"residential","coordinates":[[139.8084991,35.790774],[139.8084048,35.7919209]]},{"id":"221559411","name":"","highway":"residential","coordinates":[[139.8053532,35.7900148],[139.8054291,35.7900194],[139.8066537,35.7900974],[139.8070875,35.7901233],[139.8078846,35.7901706],[139.8079348,35.790171],[139.8079891,35.7901691],[139.8087768,35.7902193],[139.8088444,35.7902234],[139.8088978,35.7902269],[139.8091055,35.7902397],[139.8095465,35.7902668],[139.8098275,35.7902843]]},{"id":"229357886","name":"","highway":"residential","coordinates":[[139.803373,35.7915918],[139.8045865,35.7916704]]},{"id":"229357887","name":"","highway":"residential","coordinates":[[139.8025754,35.7920986],[139.8026401,35.7921026],[139.8033256,35.7921403],[139.8045262,35.7922193]]},{"id":"229357888","name":"","highway":"residential","coordinates":[[139.8052344,35.7913697],[139.8051603,35.7913651],[139.8046249,35.7913315]]},{"id":"229357963","name":"","highway":"residential","coordinates":[[139.8048234,35.7925487],[139.8047717,35.7924977],[139.8045437,35.79225],[139.8045262,35.7922193],[139.8045865,35.7916704],[139.8046249,35.7913315],[139.804641,35.7911285],[139.8046899,35.7905392],[139.8046939,35.7904867],[139.8047352,35.7899712],[139.8047746,35.7894762],[139.8047796,35.7894136]]},{"id":"251771245","name":"","highway":"residential","coordinates":[[139.8091689,35.7953998],[139.8092112,35.7949546],[139.8092164,35.7948992]]},{"id":"251771300","name":"","highway":"residential","coordinates":[[139.8031317,35.7942537],[139.8043407,35.7943251],[139.8055979,35.7944019],[139.8059824,35.7944263],[139.8068962,35.7944843]]},{"id":"435868539","name":"","highway":"residential","coordinates":[[139.8034211,35.7910473],[139.804641,35.7911285]]},{"id":"673533442","name":"","highway":"unclassified","coordinates":[[139.8259207,35.7896],[139.825481,35.7895949],[139.8252482,35.7895929],[139.8245946,35.7895758],[139.8239827,35.7895598],[139.8238739,35.7895593],[139.8233514,35.789557],[139.8228504,35.7895503],[139.8221634,35.7895378],[139.8208554,35.7895155],[139.8207942,35.7895145],[139.8207426,35.7895136],[139.8201141,35.789501],[139.8195202,35.7894873],[139.8194553,35.7894858],[139.8193966,35.7894845],[139.8187049,35.7894692],[139.8183075,35.7894598],[139.8182691,35.7894589],[139.8182069,35.7894582],[139.8175752,35.7894509],[139.8170394,35.7894448],[139.8169531,35.7894438],[139.8168836,35.7894473],[139.8162835,35.7894778],[139.8160402,35.7895076],[139.8144071,35.7897023],[139.8143411,35.7897028]]},{"id":"693423231","name":"","highway":"tertiary","coordinates":[[139.8065488,35.8006301],[139.8065553,35.8005269],[139.8065779,35.8001689],[139.8065882,35.8000337],[139.8066392,35.7993926],[139.8066432,35.7992886],[139.8066708,35.7989596],[139.8066732,35.7989296],[139.8066783,35.7988704],[139.8066814,35.7988203],[139.8067008,35.7985109],[139.8067153,35.7983284],[139.8067414,35.7979545],[139.8067777,35.7974506],[139.8067813,35.7973987],[139.8067827,35.7973372],[139.8067921,35.7969067],[139.8067983,35.7966072],[139.8068074,35.7962504],[139.8068145,35.7958097],[139.8068486,35.7954],[139.8068826,35.7951031],[139.8068844,35.7950721],[139.806895,35.7948916],[139.8068982,35.7948361]]},{"id":"697832369","name":"","highway":"unclassified","coordinates":[[139.811161,35.7899168],[139.8126069,35.7900026],[139.8127023,35.7900083]]},{"id":"698617102","name":"六六通り","highway":"tertiary","coordinates":[[139.8054016,35.7894375],[139.8053318,35.7894334],[139.8047796,35.7894136],[139.8042054,35.7893912],[139.8035681,35.789365],[139.8029074,35.7893386],[139.8028173,35.7893394],[139.8027189,35.7893422],[139.802628,35.7893404],[139.8016641,35.7893153],[139.8009232,35.789295],[139.8007939,35.7892915],[139.7998275,35.7892644],[139.7997606,35.7892625],[139.7996774,35.7892601],[139.7995363,35.7892561],[139.7983962,35.7892259],[139.798236,35.7892182],[139.7979949,35.789207],[139.7979181,35.7892034],[139.7977778,35.7891964]]},{"id":"911647517","name":"","highway":"tertiary","coordinates":[[139.8077577,35.7923707],[139.8086544,35.7924128],[139.8096285,35.7924626],[139.8102021,35.7924988],[139.8103019,35.7925047]]},{"id":"911647518","name":"花畑大橋通り","highway":"tertiary","coordinates":[[139.8103019,35.7925047],[139.810294,35.7925683],[139.8101918,35.7937238],[139.810098,35.7947963],[139.8100871,35.7949355],[139.8100734,35.7950807],[139.8100387,35.7954266],[139.8100311,35.7955244],[139.8100073,35.7958976],[139.8099941,35.7962408],[139.8099916,35.796319],[139.8099897,35.7963948],[139.8100026,35.7972054],[139.8100269,35.7980554],[139.8100292,35.7981296],[139.8100311,35.7982056],[139.8100603,35.7992129],[139.8100632,35.7993035],[139.8100652,35.7993961],[139.8100847,35.800335],[139.8100967,35.8006923],[139.8101023,35.8008293]]},{"id":"911647519","name":"花畑大橋通り","highway":"tertiary","coordinates":[[139.8105507,35.7896183],[139.810543,35.7897331],[139.8104429,35.7908269],[139.8104378,35.7908826],[139.8104318,35.7909364],[139.8103935,35.791403],[139.8103404,35.7920502],[139.810307,35.7924254],[139.8103019,35.7925047]]},{"id":"911647520","name":"六六通り","highway":"tertiary","coordinates":[[139.8169393,35.7888875],[139.8168594,35.7888972],[139.8163022,35.7889706],[139.8156759,35.7890369],[139.8144693,35.7891765],[139.8143847,35.7891863],[139.8143205,35.7891937],[139.8130981,35.7893342],[139.8128292,35.7893641],[139.8127609,35.7893717],[139.8118257,35.7894778],[139.8111924,35.7895552],[139.8107039,35.7896051],[139.8105507,35.7896183]]},{"id":"1104065083","name":"","highway":"tertiary","coordinates":[[139.8133203,35.7926853],[139.813417,35.7926916],[139.8138139,35.7927151]]},{"id":"1104065084","name":"","highway":"tertiary","coordinates":[[139.8103019,35.7925047],[139.8104111,35.7925102],[139.8109357,35.7925427],[139.8121833,35.7926159],[139.8128138,35.7926541],[139.8133203,35.7926853]]},{"id":"1104076545","name":"舎人公園通り","highway":"tertiary","coordinates":[[139.8022385,35.7947574],[139.8023471,35.7947597],[139.8024626,35.7947621],[139.8030179,35.7947768],[139.8030932,35.7947765],[139.8036289,35.7947847],[139.8042983,35.7947973],[139.8055642,35.7948154],[139.8059499,35.7948204],[139.806874,35.7948357],[139.8068982,35.7948361]]},{"id":"1104076546","name":"","highway":"residential","coordinates":[[139.8059499,35.7948204],[139.805954,35.7947711],[139.8059824,35.7944263]]},{"id":"1104076552","name":"","highway":"tertiary","coordinates":[[139.8055642,35.7948154],[139.8055686,35.7947611],[139.8055979,35.7944019],[139.8056346,35.7939319],[139.8056401,35.7938229],[139.8056378,35.7937063],[139.8056227,35.7936011],[139.8055793,35.7934618],[139.8054832,35.7932868],[139.8053437,35.7931072],[139.8049261,35.7926491],[139.8048234,35.7925487]]},{"id":"1104076553","name":"六六通り","highway":"tertiary","coordinates":[[139.8105507,35.7896183],[139.8104085,35.7896201],[139.8098859,35.7895959],[139.8090991,35.7895747],[139.8088958,35.7895672],[139.8080521,35.7895354],[139.80799,35.7895331],[139.8079195,35.7895306],[139.806709,35.789488],[139.8054833,35.7894405],[139.8054016,35.7894375]]},{"id":"1104076555","name":"","highway":"tertiary","coordinates":[[139.8032624,35.7927946],[139.8037736,35.7928036],[139.8039691,35.7928059],[139.8041066,35.7928036],[139.8042145,35.792794],[139.8043518,35.7927692],[139.8044864,35.7927306],[139.8046245,35.7926741],[139.8047593,35.792596],[139.8048234,35.7925487]]},{"id":"1226728009","name":"","highway":"residential","coordinates":[[139.8090253,35.7890106],[139.8090854,35.7890124],[139.8098705,35.7890502],[139.81049,35.7890841]]},{"id":"1284783755","name":"","highway":"residential","coordinates":[[139.8086213,35.7890688],[139.80861,35.7893353]]},{"id":"51930685","name":"","highway":"unclassified","coordinates":[[139.8233537,35.780307],[139.8233711,35.780705],[139.8233778,35.7808555],[139.8234025,35.7813372],[139.8234389,35.7818518],[139.8234587,35.7821324],[139.8234779,35.7824796],[139.8234835,35.7825429]]},{"id":"120112433","name":"","highway":"unclassified","coordinates":[[139.8154257,35.7818694],[139.8154584,35.7822294],[139.8155022,35.7826849],[139.8155502,35.7831451],[139.8155985,35.7836557],[139.8156495,35.7841579],[139.8156874,35.784544]]},{"id":"120112468","name":"","highway":"unclassified","coordinates":[[139.8182698,35.7819727],[139.8183037,35.7822663],[139.8183481,35.7826506],[139.8183762,35.7828935],[139.81841,35.7831865],[139.8184407,35.7834388],[139.8184711,35.7836891],[139.8184722,35.783698],[139.8184935,35.7838726],[139.8185032,35.7839526],[139.8185518,35.7843522]]},{"id":"185469596","name":"","highway":"unclassified","coordinates":[[139.8151309,35.7826835],[139.8151323,35.7827479],[139.8151408,35.7831558]]},{"id":"188868569","name":"","highway":"residential","coordinates":[[139.8187509,35.7816207],[139.8187441,35.7816447],[139.8186432,35.7820022]]},{"id":"221559098","name":"","highway":"unclassified","coordinates":[[139.8193182,35.7819549],[139.8193453,35.7821826],[139.819399,35.7826333],[139.819456,35.7831122],[139.8194838,35.7833705],[139.81951,35.7836136],[139.8195525,35.7839651],[139.819589,35.7842785],[139.8196207,35.784541],[139.819661,35.784902],[139.8196888,35.7851309],[139.8197299,35.7854697],[139.8197361,35.785521],[139.8197422,35.7855799],[139.8197646,35.7857963],[139.8197958,35.7860535],[139.8198168,35.7862411],[139.8198274,35.7863362],[139.8198708,35.7867236],[139.8198741,35.7867526],[139.8198789,35.7867994],[139.8199527,35.7874195],[139.8199471,35.7874646]]},{"id":"221559356","name":"","highway":"unclassified","coordinates":[[139.8208085,35.7932457],[139.8208084,35.7926618],[139.8208065,35.7921041],[139.8208023,35.7917578],[139.8208029,35.791344],[139.8207996,35.7905625],[139.820804,35.7900327],[139.8208004,35.7898443],[139.8207951,35.7895616],[139.8207942,35.7895145],[139.8207934,35.7894587],[139.8207874,35.7890162],[139.8207863,35.7889345],[139.8207874,35.7888632],[139.8207955,35.7883505],[139.8207858,35.7879612],[139.8207833,35.7875275],[139.8208361,35.7871886],[139.8208812,35.7869235],[139.8209104,35.7867278],[139.8209121,35.7866755],[139.8209074,35.7866349],[139.8208855,35.7864451],[139.8208623,35.78626],[139.820832,35.7859726],[139.8207912,35.7857231],[139.8207769,35.7855459],[139.8207731,35.7854984],[139.8207685,35.7854411],[139.8207615,35.7853828],[139.820756,35.7853372],[139.8207106,35.7849582],[139.8206947,35.7848253],[139.8206209,35.7842045],[139.8205497,35.7835575],[139.8205276,35.7833737],[139.8205133,35.7832561],[139.8204858,35.7830297],[139.8204339,35.7826154],[139.8203891,35.7821434],[139.8203674,35.7818805],[139.8203446,35.7815997],[139.8203355,35.7815102],[139.8203225,35.781373],[139.8203008,35.7811174],[139.8202898,35.7809394],[139.8202752,35.7807096],[139.8202913,35.7806506],[139.8204246,35.7804119],[139.8206003,35.7800998],[139.8208482,35.7796593],[139.8209633,35.779434],[139.8209905,35.7793889]]},{"id":"229484051","name":"平方東京線","highway":"secondary","coordinates":[[139.8217566,35.784123],[139.8217419,35.7840067],[139.8216845,35.7834705],[139.8215755,35.7825935],[139.8214792,35.7817893]]},{"id":"314976800","name":"環七北通り","highway":"tertiary","coordinates":[[139.8253476,35.7824239],[139.8250812,35.7824687],[139.8248451,35.7825014],[139.8246198,35.7825166],[139.824412,35.7825231],[139.8240802,35.7825305]]},{"id":"367431406","name":"","highway":"residential","coordinates":[[139.820962,35.7829908],[139.8204858,35.7830297]]},{"id":"367431412","name":"","highway":"residential","coordinates":[[139.8203891,35.7821434],[139.8208983,35.7821036],[139.820866,35.7818396]]},{"id":"367431419","name":"","highway":"residential","coordinates":[[139.8210971,35.784175],[139.8210206,35.7835168],[139.8209875,35.7832197],[139.820962,35.7829908]]},{"id":"572015593","name":"","highway":"unclassified","coordinates":[[139.8220495,35.7821966],[139.8220113,35.7819227],[139.8219775,35.7817533],[139.8219668,35.7815847],[139.8219479,35.7812871],[139.8219177,35.7806039],[139.8219209,35.780073],[139.8219416,35.7795194]]},{"id":"576682989","name":"","highway":"residential","coordinates":[[139.8244255,35.7795897],[139.8246037,35.7804013],[139.8247273,35.7807642],[139.8248834,35.781223],[139.824993,35.7816256],[139.8251106,35.7820267],[139.8251915,35.782313],[139.8251722,35.7823478],[139.8247795,35.7824052],[139.8246186,35.7824174],[139.8243825,35.7824209],[139.8243565,35.7823974],[139.8243414,35.7820954]]},{"id":"610812037","name":"","highway":"residential","coordinates":[[139.8265921,35.7820701],[139.8265389,35.7820798],[139.8264117,35.7821031],[139.8263305,35.7821256],[139.8262291,35.7821644],[139.8261498,35.7821746],[139.8260814,35.7821838],[139.8259434,35.7816746],[139.8257297,35.7809101],[139.8256172,35.7805232],[139.8254743,35.7799395],[139.825371,35.7794957],[139.8251632,35.7787516],[139.825146,35.778696],[139.8249513,35.7779497],[139.8249521,35.7779179],[139.8249912,35.7778527]]},{"id":"673554581","name":"","highway":"unclassified","coordinates":[[139.8177968,35.7869202],[139.8177805,35.7867946],[139.8177526,35.7865803],[139.8177453,35.7865216],[139.8177312,35.7863887],[139.817719,35.7862896],[139.8177084,35.786172],[139.8177007,35.7861049],[139.8176803,35.7859279],[139.8176582,35.7857365],[139.8176526,35.7856875],[139.817647,35.7856307],[139.8175937,35.7850901],[139.8175141,35.7844738],[139.8175106,35.7844231],[139.8174582,35.7839595],[139.8174363,35.7837659],[139.8174077,35.7835128],[139.8173802,35.7832695],[139.8173438,35.7829656],[139.8173081,35.7826676],[139.8172704,35.7823373],[139.817229,35.7819119]]},{"id":"698686175","name":"","highway":"residential","coordinates":[[139.8227408,35.7825617],[139.8227074,35.7821685],[139.822691,35.7818885],[139.8226715,35.7815531],[139.8226607,35.781369],[139.8226532,35.7812586],[139.8226072,35.7805864]]},{"id":"698686177","name":"","highway":"residential","coordinates":[[139.8251106,35.7820267],[139.8245279,35.7820866],[139.8243414,35.7820954],[139.8240161,35.7821066],[139.8234587,35.7821324],[139.8227074,35.7821685],[139.8220495,35.7821966]]},{"id":"698686178","name":"","highway":"residential","coordinates":[[139.8240161,35.7821066],[139.823968,35.7813131]]},{"id":"698686179","name":"","highway":"residential","coordinates":[[139.8245279,35.7820866],[139.8244489,35.7816949],[139.8243721,35.7812958],[139.8242914,35.7808119],[139.8242192,35.7804133]]},{"id":"698686187","name":"環七北通り","highway":"tertiary","coordinates":[[139.8204339,35.7826154],[139.8209647,35.7826065],[139.8215755,35.7825935]]},{"id":"699692440","name":"","highway":"residential","coordinates":[[139.8236278,35.7839668],[139.8236252,35.7839392],[139.8236057,35.7837353],[139.823597,35.7836439],[139.8235773,35.7834381],[139.823557,35.7832256],[139.8235518,35.7831713],[139.8235353,35.782999],[139.8234876,35.7826009],[139.8234835,35.7825429]]},{"id":"783589574","name":"環七北通り","highway":"tertiary","coordinates":[[139.8240802,35.7825305],[139.8234835,35.7825429],[139.8227408,35.7825617],[139.8226361,35.7825643],[139.8220941,35.782578],[139.8215755,35.7825935]]},{"id":"818626767","name":"","highway":"residential","coordinates":[[139.8227998,35.7840365],[139.8227962,35.7840033],[139.8227642,35.78371],[139.822741,35.7834972],[139.8227299,35.7833951],[139.8227189,35.7832944],[139.8226929,35.7830555],[139.8226361,35.7825643]]},{"id":"818626770","name":"","highway":"residential","coordinates":[[139.8221569,35.7830964],[139.8226929,35.7830555],[139.8235353,35.782999],[139.8243933,35.7829302],[139.8246557,35.7829092],[139.8248501,35.7828936],[139.8253349,35.7828559]]},{"id":"818626772","name":"","highway":"residential","coordinates":[[139.8221979,35.7834348],[139.8221569,35.7830964],[139.8220941,35.782578]]},{"id":"948654140","name":"","highway":"tertiary","coordinates":[[139.8158077,35.779751],[139.8158295,35.7799307],[139.8158357,35.7799881],[139.8158418,35.780035],[139.8159295,35.7808204],[139.8159745,35.781166],[139.8159821,35.7812328],[139.8160128,35.7815048],[139.8160422,35.781839],[139.8160469,35.7818923],[139.8160504,35.7819326],[139.8160653,35.7821014],[139.8160858,35.7823435],[139.8161043,35.7825886],[139.8161111,35.7826873]]},{"id":"967014086","name":"","highway":"tertiary","coordinates":[[139.8161111,35.7826873],[139.8161175,35.7827616],[139.8161329,35.782892],[139.8161504,35.7830104],[139.8161734,35.7831439],[139.8162241,35.7833635],[139.816275,35.7836093],[139.8163845,35.7841074],[139.8164562,35.7844237],[139.8164711,35.7844877]]},{"id":"1028708893","name":"","highway":"residential","coordinates":[[139.8244992,35.7839046],[139.8244634,35.7835754],[139.8244184,35.7831615],[139.8243933,35.7829302]]},{"id":"1028708895","name":"","highway":"residential","coordinates":[[139.8243933,35.7829302],[139.8243632,35.7826496],[139.8243825,35.7826261],[139.8245724,35.7826161],[139.824655,35.7826096],[139.8252236,35.78254],[139.8252665,35.7825852],[139.8253349,35.7828559],[139.8253913,35.7830881],[139.8255766,35.7838407]]},{"id":"1028708897","name":"","highway":"residential","coordinates":[[139.8248788,35.7831266],[139.8248501,35.7828936]]},{"id":"1029333881","name":"環七北通り","highway":"tertiary","coordinates":[[139.8259775,35.7823197],[139.8264728,35.7822391],[139.8266042,35.7822154]]},{"id":"1029333885","name":"環七北通り","highway":"tertiary","coordinates":[[139.8259775,35.7823197],[139.8253476,35.7824239]]},{"id":"1150152681","name":"環七北通り","highway":"tertiary","coordinates":[[139.8161111,35.7826873],[139.8161787,35.7826862],[139.8173081,35.7826676],[139.8182732,35.7826518],[139.8183481,35.7826506],[139.819399,35.7826333],[139.8204339,35.7826154]]},{"id":"1150152682","name":"","highway":"residential","coordinates":[[139.8172704,35.7823373],[139.8176732,35.782307],[139.8183037,35.7822663],[139.8193453,35.7821826]]},{"id":"1150152683","name":"","highway":"residential","coordinates":[[139.8176732,35.782307],[139.8176268,35.7819166]]},{"id":"1150152684","name":"","highway":"residential","coordinates":[[139.8173438,35.7829656],[139.8183762,35.7828935]]},{"id":"101970535","name":"","highway":"unclassified","coordinates":[[139.825203,35.7934474],[139.8248794,35.7929787],[139.8246359,35.7926312],[139.8246292,35.7925977],[139.8246132,35.7921113],[139.8246092,35.7918218],[139.8246059,35.7917213],[139.824606,35.7914288],[139.8245967,35.7907888],[139.8246058,35.7903054],[139.8246046,35.790219],[139.8245967,35.7896326],[139.8245946,35.7895758],[139.8245938,35.7895298],[139.8245974,35.7894962],[139.8246003,35.7893287],[139.8245946,35.7890842],[139.8245922,35.7889786],[139.8245957,35.788861],[139.8245874,35.788475],[139.8245875,35.7883573],[139.8245856,35.7882454],[139.8245804,35.7879579],[139.8245909,35.7878866]]},{"id":"101970557","name":"","highway":"residential","coordinates":[[139.8221424,35.7876573],[139.8220439,35.7876487],[139.8214888,35.7876006],[139.8213022,35.7875813],[139.8212291,35.7875737],[139.8208457,35.787534],[139.8207833,35.7875275],[139.8207125,35.7875221],[139.8201035,35.787476],[139.8199471,35.7874646],[139.819707,35.7874508],[139.8196498,35.78745],[139.8194371,35.7874622],[139.8192276,35.7874776],[139.8189027,35.7874799],[139.818794,35.7874842],[139.8182267,35.7875093],[139.817912,35.7875279],[139.8176646,35.7875322],[139.8175976,35.7875326],[139.8171788,35.7875156],[139.8168382,35.7875698]]},{"id":"101970573","name":"","highway":"residential","coordinates":[[139.8207955,35.7883505],[139.8207414,35.7883522],[139.8205452,35.7883584],[139.8201121,35.7883562],[139.8195197,35.7883472],[139.8194419,35.788346],[139.8193698,35.7883451],[139.8182788,35.7883319],[139.8182168,35.7883309]]},{"id":"101970620","name":"","highway":"unclassified","coordinates":[[139.8168478,35.7876341],[139.8167992,35.7876366],[139.8166251,35.7876454],[139.8163829,35.7876633],[139.8162893,35.7876676],[139.8158068,35.7876937],[139.8157605,35.7876952],[139.8155321,35.7877009],[139.8151897,35.7877349],[139.8145861,35.7877732],[139.8145216,35.7877818]]},{"id":"101970813","name":"","highway":"unclassified","coordinates":[[139.8194371,35.7874622],[139.8194372,35.7875044],[139.8194374,35.7875448],[139.8194386,35.7879275],[139.8194419,35.788346],[139.819431,35.7888103],[139.8194495,35.7889198]]},{"id":"120112414","name":"","highway":"unclassified","coordinates":[[139.8269803,35.7880948],[139.8269198,35.7881078],[139.8268051,35.7881085],[139.8267461,35.7881062],[139.8261912,35.7880517],[139.8260646,35.7880319],[139.8259105,35.7880203],[139.82561,35.7879921],[139.8255466,35.7879648],[139.8255445,35.787909],[139.8255376,35.7877663],[139.8255273,35.7876096],[139.8255079,35.7875412],[139.8254596,35.7873626],[139.8253043,35.7867608],[139.825234,35.7864881],[139.8251556,35.7861844],[139.8251434,35.7861372],[139.8251289,35.7860815],[139.8250697,35.7858548],[139.8250225,35.7856735],[139.824942,35.785365],[139.8248703,35.78509]]},{"id":"120112431","name":"","highway":"unclassified","coordinates":[[139.8233537,35.788971],[139.8233533,35.7890711],[139.8233527,35.7892338],[139.8233514,35.789557],[139.8233521,35.7900414],[139.8233525,35.7903121],[139.8233573,35.7908873],[139.8233615,35.7913991],[139.8233614,35.791773],[139.823361,35.7920301],[139.8233616,35.792446],[139.823367,35.7925372],[139.8234539,35.7929617],[139.8234697,35.7930043],[139.8239425,35.7935577],[139.8243074,35.7939722]]},{"id":"120112464","name":"","highway":"unclassified","coordinates":[[139.8162241,35.7833635],[139.8162775,35.7833576],[139.8173802,35.7832695],[139.8178431,35.7832322],[139.81841,35.7831865],[139.8189311,35.7831527],[139.819456,35.7831122],[139.8199175,35.7830757],[139.8204858,35.7830297]]},{"id":"120112471","name":"","highway":"unclassified","coordinates":[[139.8229547,35.7852748],[139.8229586,35.785312],[139.8229596,35.7853225],[139.8229632,35.7853573],[139.8230127,35.7858333],[139.8230316,35.7860175],[139.8230467,35.7861642],[139.8230562,35.7862566],[139.8230824,35.7865113],[139.8231282,35.7867793],[139.8231642,35.7869214],[139.8232243,35.7871877],[139.8232736,35.7874254],[139.8233296,35.7876926],[139.8233222,35.787741]]},{"id":"120112483","name":"","highway":"unclassified","coordinates":[[139.8176646,35.7875322],[139.8177244,35.7872934],[139.8177946,35.7869857],[139.8177968,35.7869202]]},{"id":"120114999","name":"","highway":"unclassified","coordinates":[[139.8182145,35.7879094],[139.8182777,35.7879103],[139.8193779,35.7879266],[139.8194386,35.7879275]]},{"id":"120115010","name":"","highway":"unclassified","coordinates":[[139.8163829,35.7876633],[139.8163361,35.7883417],[139.8163055,35.7889088],[139.8163022,35.7889706],[139.8162835,35.7894778]]},{"id":"120115032","name":"","highway":"unclassified","coordinates":[[139.8182773,35.7899476],[139.8182766,35.789907],[139.8182758,35.7898558],[139.8182719,35.7896257],[139.8182698,35.789503],[139.8182691,35.7894589],[139.8182662,35.7894241],[139.8182321,35.7890121],[139.8182288,35.7889719],[139.8182089,35.7889024],[139.8182127,35.7888294],[139.8182168,35.7883309],[139.8182145,35.7879094],[139.8182256,35.7875467],[139.8182267,35.7875093]]},{"id":"120115036","name":"","highway":"unclassified","coordinates":[[139.8255766,35.7838407],[139.8252518,35.7838593],[139.8247403,35.7838886],[139.8244992,35.7839046],[139.8243258,35.7839161],[139.8236278,35.7839668],[139.8234424,35.7839802],[139.8232484,35.7839939],[139.8231125,35.7840096]]},{"id":"120115042","name":"","highway":"unclassified","coordinates":[[139.8175976,35.7875326],[139.817597,35.7875658],[139.8175831,35.7883314]]},{"id":"120145969","name":"","highway":"unclassified","coordinates":[[139.8157605,35.7876952],[139.8157187,35.7884102],[139.8156799,35.7889786],[139.8156759,35.7890369]]},{"id":"120146029","name":"","highway":"residential","coordinates":[[139.8152852,35.7845793],[139.81529,35.7846581],[139.815284,35.7847652],[139.8152983,35.7848723],[139.8153263,35.7850812],[139.815359,35.7852822],[139.8153604,35.7852955],[139.8153667,35.7853534],[139.8153825,35.7855],[139.8154212,35.7858569],[139.8157348,35.7870717],[139.8157796,35.7874584],[139.815803,35.787661],[139.8158068,35.7876937]]},{"id":"120146065","name":"","highway":"unclassified","coordinates":[[139.8151389,35.7884821],[139.8151897,35.7877349]]},{"id":"150435568","name":"","highway":"residential","coordinates":[[139.8201121,35.7883562],[139.8201117,35.7883158],[139.820104,35.7875319],[139.8201035,35.787476]]},{"id":"150435575","name":"","highway":"residential","coordinates":[[139.8186173,35.7849735],[139.8191478,35.7849364],[139.819661,35.784902],[139.8201131,35.7848665]]},{"id":"153734620","name":"","highway":"residential","coordinates":[[139.8207858,35.7879612],[139.8208464,35.7879645],[139.8212561,35.7879869],[139.8213912,35.7879943],[139.8220106,35.7880281],[139.822043,35.7880299],[139.8221405,35.7880352],[139.8222326,35.7880411],[139.8222854,35.7880445],[139.8227849,35.7880765],[139.823318,35.7880987]]},{"id":"153735277","name":"","highway":"tertiary","coordinates":[[139.8194495,35.7889198],[139.8194568,35.7890363],[139.8194554,35.7894527],[139.8194553,35.7894858],[139.8194558,35.7895396],[139.8194601,35.7899653],[139.8194606,35.7900009],[139.819461,35.7900273],[139.8194685,35.7905717],[139.8194721,35.7908786],[139.8194779,35.7912584],[139.8194779,35.7913155],[139.8194786,35.791372],[139.8194835,35.7918013],[139.8194968,35.7929649],[139.8195029,35.7934461],[139.8195041,35.7935411],[139.8195066,35.7936387],[139.8195122,35.7938567],[139.8195153,35.7939748],[139.8195156,35.793988],[139.8195402,35.7940318]]},{"id":"153735278","name":"","highway":"residential","coordinates":[[139.8213912,35.7879943],[139.8213967,35.7889438]]},{"id":"185025759","name":"","highway":"tertiary","coordinates":[[139.8212825,35.7853973],[139.8213006,35.7853229],[139.8212981,35.7852873],[139.8212914,35.7851912],[139.8212944,35.7851601],[139.8213069,35.7851409],[139.8213342,35.7851258],[139.8213678,35.7851175],[139.8215806,35.7851032],[139.8216094,35.785096],[139.8216319,35.7850804],[139.8216454,35.7850551],[139.8216484,35.7850334],[139.8216492,35.7850092],[139.8216453,35.784965],[139.8216322,35.7848374],[139.8216261,35.7847861]]},{"id":"185480238","name":"","highway":"unclassified","coordinates":[[139.8164661,35.7852628],[139.8160976,35.7852972],[139.8158495,35.7853163],[139.8153667,35.7853534]]},{"id":"185480300","name":"","highway":"unclassified","coordinates":[[139.815284,35.7847652],[139.8156282,35.7847941],[139.8156799,35.7848183],[139.8160148,35.7848344],[139.8160976,35.7852972]]},{"id":"206477908","name":"","highway":"residential","coordinates":[[139.8228109,35.7874572],[139.8229587,35.787449],[139.8232736,35.7874254],[139.8234837,35.7873886],[139.8240888,35.7872822],[139.8243708,35.7872283]]},{"id":"206477910","name":"","highway":"residential","coordinates":[[139.8239203,35.7857243],[139.823837,35.7857341],[139.8233571,35.7857902],[139.8230127,35.7858333]]},{"id":"206477912","name":"","highway":"residential","coordinates":[[139.8225501,35.785303],[139.8225546,35.7853438],[139.8226315,35.7860426],[139.8226587,35.7862905],[139.8226861,35.7865393],[139.8227331,35.7869572],[139.8227728,35.7872109],[139.8228109,35.7874572],[139.8228277,35.7877044]]},{"id":"221559095","name":"","highway":"residential","coordinates":[[139.8223606,35.7846378],[139.8224072,35.7850389],[139.8224309,35.7852757],[139.8224345,35.7853113]]},{"id":"221559096","name":"","highway":"residential","coordinates":[[139.8195525,35.7839651],[139.8200137,35.7839337]]},{"id":"221559097","name":"","highway":"residential","coordinates":[[139.8200759,35.7845113],[139.8196207,35.784541],[139.8191119,35.7845757]]},{"id":"221559099","name":"","highway":"residential","coordinates":[[139.81951,35.7836136],[139.8199725,35.7835741]]},{"id":"221559101","name":"","highway":"tertiary","coordinates":[[139.8190812,35.7843149],[139.8191119,35.7845757],[139.8191478,35.7849364],[139.8191738,35.7851674],[139.8192125,35.785512],[139.8192184,35.785564]]},{"id":"221559102","name":"","highway":"unclassified","coordinates":[[139.8199175,35.7830757],[139.8199198,35.7830944]]},{"id":"221559103","name":"","highway":"unclassified","coordinates":[[139.8253102,35.7843964],[139.8247924,35.7844389],[139.8245971,35.7844536],[139.823686,35.7845309],[139.8233069,35.7845613],[139.8232528,35.7845658],[139.8229682,35.7845894],[139.8229428,35.7845915],[139.8228694,35.7845976],[139.8228116,35.7846018],[139.8227602,35.7846062],[139.8223606,35.7846378]]},{"id":"221559104","name":"","highway":"residential","coordinates":[[139.8199555,35.783408],[139.8205276,35.7833737]]},{"id":"221559354","name":"","highway":"unclassified","coordinates":[[139.8233069,35.7845613],[139.823253,35.7840389],[139.8232484,35.7839939]]},{"id":"221559363","name":"","highway":"unclassified","coordinates":[[139.8255079,35.7875412],[139.8262213,35.7875462],[139.8267999,35.7874412]]},{"id":"221559365","name":"","highway":"residential","coordinates":[[139.8227849,35.7880765],[139.8227897,35.7883739],[139.8227971,35.7888409],[139.8227976,35.7888734],[139.822799,35.7889589]]},{"id":"231088876","name":"","highway":"tertiary","coordinates":[[139.8164711,35.7844877],[139.8164814,35.7845308],[139.8165116,35.784691],[139.8165272,35.7848209],[139.8165235,35.7849277],[139.816511,35.7850519],[139.8164832,35.7851918],[139.8164661,35.7852628],[139.8163861,35.785508],[139.8163113,35.7857373],[139.8162974,35.7857812],[139.8162816,35.7858304],[139.8162601,35.7859262],[139.816248,35.7860271],[139.8162432,35.7861269],[139.8162449,35.7862139],[139.8162602,35.7863061],[139.8163036,35.786413],[139.8163466,35.7865016],[139.8163547,35.7865184],[139.8164075,35.7866162],[139.8165055,35.7867996],[139.8166138,35.7869703],[139.8166434,35.7870082],[139.8166711,35.7870532],[139.8167165,35.7871414],[139.8167566,35.7872383],[139.8167998,35.787394],[139.8168382,35.7875698],[139.8168478,35.7876341],[139.8168754,35.7878919],[139.8168982,35.7882138],[139.8169053,35.7883146],[139.8169308,35.788768],[139.8169393,35.7888875]]},{"id":"251776861","name":"","highway":"residential","coordinates":[[139.8163036,35.786413],[139.8168655,35.786364],[139.8171425,35.7863399],[139.817375,35.7863196],[139.8173908,35.7863182],[139.817719,35.7862896]]},{"id":"251776864","name":"","highway":"residential","coordinates":[[139.816511,35.7850519],[139.8169572,35.7850655],[139.8173215,35.7850796],[139.8175937,35.7850901]]},{"id":"280180592","name":"","highway":"unclassified","coordinates":[[139.8182168,35.7883309],[139.8181602,35.7883309],[139.8175831,35.7883314],[139.8169053,35.7883146]]},{"id":"367431397","name":"","highway":"residential","coordinates":[[139.8238368,35.7875283],[139.8239076,35.7878178]]},{"id":"367431400","name":"","highway":"residential","coordinates":[[139.8227331,35.7869572],[139.8231642,35.7869214]]},{"id":"367431402","name":"","highway":"residential","coordinates":[[139.8187397,35.7860061],[139.8192645,35.7859658]]},{"id":"367431403","name":"","highway":"residential","coordinates":[[139.8208812,35.7869235],[139.8209438,35.7869191],[139.8214049,35.7868866]]},{"id":"367431404","name":"","highway":"unclassified","coordinates":[[139.8239973,35.7884705],[139.8239659,35.7878759],[139.8239626,35.7878239]]},{"id":"367431405","name":"","highway":"residential","coordinates":[[139.8201131,35.7848665],[139.8206947,35.7848253]]},{"id":"367431407","name":"","highway":"residential","coordinates":[[139.8188043,35.7865678],[139.8193301,35.7865229]]},{"id":"367431409","name":"","highway":"residential","coordinates":[[139.8187786,35.7863524],[139.8193018,35.7863062]]},{"id":"367431410","name":"","highway":"residential","coordinates":[[139.8182348,35.7861345],[139.8182027,35.7858888],[139.8181797,35.7856953],[139.8181734,35.7856423]]},{"id":"367431411","name":"","highway":"residential","coordinates":[[139.8169115,35.7867654],[139.8168884,35.7865765],[139.8168655,35.786364]]},{"id":"367431414","name":"","highway":"residential","coordinates":[[139.8177084,35.786172],[139.8181202,35.7861438],[139.8182348,35.7861345],[139.81875,35.7860929]]},{"id":"367431415","name":"","highway":"unclassified","coordinates":[[139.8233137,35.7884653],[139.8239973,35.7884705],[139.8245874,35.788475]]},{"id":"367431416","name":"","highway":"residential","coordinates":[[139.8197646,35.7857963],[139.8198276,35.7857913],[139.8202701,35.7857565],[139.8203185,35.7857527],[139.820751,35.7857256],[139.8207912,35.7857231]]},{"id":"367431417","name":"","highway":"residential","coordinates":[[139.8162432,35.7861269],[139.817346,35.7860612]]},{"id":"367431418","name":"","highway":"residential","coordinates":[[139.8235396,35.7875794],[139.8238368,35.7875283],[139.8241466,35.7874707]]},{"id":"367431420","name":"","highway":"residential","coordinates":[[139.8231282,35.7867793],[139.8238802,35.7866529],[139.8241617,35.7866026]]},{"id":"367431422","name":"","highway":"residential","coordinates":[[139.8203491,35.7860095],[139.8203185,35.7857527],[139.8202938,35.7855323],[139.8202877,35.7854784]]},{"id":"367431423","name":"","highway":"residential","coordinates":[[139.8235838,35.7877663],[139.8235396,35.7875794],[139.8234837,35.7873886]]},{"id":"367431424","name":"","highway":"residential","coordinates":[[139.8240031,35.7870298],[139.8240888,35.7872822],[139.8241466,35.7874707],[139.824269,35.7878546]]},{"id":"367431425","name":"","highway":"residential","coordinates":[[139.8177526,35.7865803],[139.818168,35.7865455],[139.8187958,35.7864958]]},{"id":"367431426","name":"","highway":"residential","coordinates":[[139.8197958,35.7860535],[139.8198519,35.7860491],[139.8201947,35.7860222],[139.8203491,35.7860095],[139.8207755,35.7859769],[139.820832,35.7859726]]},{"id":"367431427","name":"","highway":"residential","coordinates":[[139.8202773,35.7867209],[139.8202724,35.7866782],[139.8202508,35.7864919],[139.8202279,35.7863107],[139.8201947,35.7860222]]},{"id":"367431428","name":"","highway":"residential","coordinates":[[139.8227728,35.7872109],[139.8232243,35.7871877],[139.8240031,35.7870298],[139.8238802,35.7866529]]},{"id":"367431429","name":"","highway":"residential","coordinates":[[139.818207,35.7868875],[139.8181924,35.7867597],[139.818168,35.7865455],[139.8181452,35.7863563],[139.8181202,35.7861438]]},{"id":"367431430","name":"","highway":"residential","coordinates":[[139.8198274,35.7863362],[139.8202279,35.7863107],[139.8208074,35.7862728],[139.8208623,35.78626],[139.8209196,35.7862444],[139.8213365,35.7862156]]},{"id":"367431431","name":"","highway":"residential","coordinates":[[139.8165055,35.7867996],[139.8169115,35.7867654],[139.817189,35.7867445],[139.8171678,35.7865647],[139.8171425,35.7863399]]},{"id":"367431432","name":"","highway":"residential","coordinates":[[139.8192184,35.785564],[139.8192241,35.7856138],[139.8192645,35.7859658],[139.8192983,35.7862746],[139.8193018,35.7863062],[139.8193301,35.7865229],[139.8193575,35.786801]]},{"id":"367431433","name":"","highway":"residential","coordinates":[[139.8214888,35.7876006],[139.821484,35.7875569],[139.8214392,35.7871464],[139.8214049,35.7868866],[139.8213827,35.7866856],[139.8213777,35.7866404],[139.8213732,35.7865935],[139.8213365,35.7862156],[139.8213032,35.7859258],[139.8218357,35.7858835],[139.8219577,35.7858736]]},{"id":"367431704","name":"","highway":"residential","coordinates":[[139.8205497,35.7835575],[139.8210206,35.7835168],[139.8216845,35.7834705]]},{"id":"441673518","name":"","highway":"tertiary","coordinates":[[139.8216261,35.7847861],[139.8216209,35.7847432],[139.8216088,35.7847143],[139.8215949,35.7846948],[139.8215711,35.7846749],[139.8215416,35.78466],[139.8215084,35.7846545],[139.8213089,35.7846668],[139.8212829,35.7846712],[139.8212518,35.784685],[139.821225,35.7847063],[139.8212057,35.7847311],[139.821196,35.7847568],[139.8211937,35.7847826],[139.8212043,35.7848717],[139.8212117,35.7849405]]},{"id":"572015594","name":"","highway":"tertiary","coordinates":[[139.8227998,35.7840365],[139.8228045,35.7840747],[139.8228694,35.7845976],[139.8229414,35.7851697],[139.8229464,35.7852092],[139.8229495,35.7852337],[139.8229547,35.7852748]]},{"id":"637448580","name":"","highway":"unclassified","coordinates":[[139.8237794,35.7851913],[139.8238202,35.7851871],[139.8243285,35.7851381],[139.8246648,35.7851007],[139.8247934,35.7850847],[139.8248435,35.7850843],[139.8248703,35.78509],[139.82494,35.7851082],[139.8253554,35.7852134],[139.8260404,35.7853986],[139.8261032,35.7853976],[139.8262179,35.7853791]]},{"id":"673533443","name":"","highway":"unclassified","coordinates":[[139.8259207,35.7896],[139.8259181,35.7895542],[139.8259166,35.7891781],[139.825915,35.7887776],[139.825911,35.7884479],[139.8259099,35.7883608],[139.8259105,35.7880203]]},{"id":"673549616","name":"","highway":"unclassified","coordinates":[[139.8245909,35.7878866],[139.8245731,35.7878257],[139.8244844,35.7875386],[139.8243708,35.7872283],[139.8242807,35.7869586],[139.82422,35.7867769],[139.8241617,35.7866026],[139.8240789,35.7863356],[139.8240101,35.7860669],[139.8239203,35.7857243],[139.8237794,35.7851913],[139.8237594,35.7851314],[139.8237261,35.7848593],[139.823686,35.7845309],[139.8236711,35.7843726]]},{"id":"673549617","name":"","highway":"unclassified","coordinates":[[139.8255466,35.7879648],[139.8252031,35.7879417],[139.8249712,35.7879287],[139.8246397,35.787892],[139.8245909,35.7878866],[139.824269,35.7878546],[139.8239626,35.7878239],[139.8239076,35.7878178],[139.8235838,35.7877663],[139.8233728,35.7877459],[139.8233222,35.787741],[139.8228277,35.7877044],[139.8222443,35.787663],[139.8222298,35.7876622],[139.8221424,35.7876573]]},{"id":"673554580","name":"","highway":"unclassified","coordinates":[[139.8233222,35.787741],[139.8233217,35.7877868],[139.823318,35.7880987],[139.8233137,35.7884653],[139.8233088,35.7888738],[139.8233085,35.7888981],[139.8233077,35.7889699]]},{"id":"698617104","name":"","highway":"residential","coordinates":[[139.817375,35.7863196],[139.817354,35.7861325],[139.817346,35.7860612],[139.8173125,35.7857626],[139.8173071,35.7857144]]},{"id":"698617105","name":"","highway":"residential","coordinates":[[139.817189,35.7867445],[139.8172935,35.7867376],[139.8173178,35.7869494]]},{"id":"698617107","name":"","highway":"unclassified","coordinates":[[139.8186173,35.7849735],[139.818688,35.7855514],[139.8186944,35.7856039],[139.8187005,35.7856577],[139.8187397,35.7860061],[139.81875,35.7860929],[139.8187786,35.7863524],[139.8187958,35.7864958],[139.8188043,35.7865678],[139.818834,35.7868404],[139.8188882,35.7872895],[139.8189027,35.7874799]]},{"id":"698617109","name":"","highway":"tertiary","coordinates":[[139.8176794,35.785683],[139.8177061,35.7856785],[139.8181734,35.7856423],[139.8186944,35.7856039],[139.8192184,35.785564],[139.8197361,35.785521],[139.8201917,35.7854861],[139.8202877,35.7854784],[139.8207685,35.7854411],[139.8212825,35.7853973]]},{"id":"698617116","name":"","highway":"tertiary","coordinates":[[139.8231125,35.7840096],[139.8227998,35.7840365],[139.8218908,35.7841122],[139.8217566,35.784123]]},{"id":"698686183","name":"","highway":"residential","coordinates":[[139.8253554,35.7852134],[139.8253749,35.7851666],[139.8253102,35.7843964],[139.8252563,35.783901],[139.8252518,35.7838593]]},{"id":"698686184","name":"","highway":"residential","coordinates":[[139.8247403,35.7838886],[139.8247435,35.7839227],[139.8247924,35.7844389]]},{"id":"698686185","name":"","highway":"residential","coordinates":[[139.8246648,35.7851007],[139.8245971,35.7844536]]},{"id":"698686186","name":"","highway":"tertiary","coordinates":[[139.8199198,35.7830944],[139.8199555,35.783408],[139.8199725,35.7835741],[139.8200121,35.7839196],[139.8200137,35.7839337],[139.8200499,35.784248],[139.8200759,35.7845113],[139.8201131,35.7848665],[139.8201853,35.7854357],[139.8201917,35.7854861]]},{"id":"698702863","name":"","highway":"residential","coordinates":[[139.8189311,35.7831527],[139.818963,35.7833998],[139.8189968,35.7836611],[139.8190292,35.7839124],[139.8190812,35.7843149]]},{"id":"698702864","name":"","highway":"residential","coordinates":[[139.8174582,35.7839595],[139.8179871,35.7839151],[139.8184935,35.7838726]]},{"id":"698702865","name":"","highway":"residential","coordinates":[[139.8174363,35.7837659],[139.8179047,35.7837312],[139.8178734,35.783477],[139.8178431,35.7832322]]},{"id":"698702866","name":"","highway":"residential","coordinates":[[139.8174077,35.7835128],[139.8178734,35.783477]]},{"id":"698702867","name":"","highway":"residential","coordinates":[[139.8180396,35.7843871],[139.8179871,35.7839151],[139.8179661,35.7837278],[139.8184711,35.7836891]]},{"id":"698702868","name":"","highway":"residential","coordinates":[[139.8179047,35.7837312],[139.8179661,35.7837278]]},{"id":"698702869","name":"","highway":"residential","coordinates":[[139.8185032,35.7839526],[139.8190292,35.7839124]]},{"id":"698702870","name":"","highway":"residential","coordinates":[[139.8184722,35.783698],[139.8189968,35.7836611]]},{"id":"698702871","name":"","highway":"residential","coordinates":[[139.8184407,35.7834388],[139.818963,35.7833998]]},{"id":"698702872","name":"","highway":"residential","coordinates":[[139.818963,35.7833998],[139.8194838,35.7833705]]},{"id":"698738258","name":"","highway":"residential","coordinates":[[139.8252031,35.7879417],[139.8250627,35.787433]]},{"id":"698738259","name":"","highway":"residential","coordinates":[[139.8244844,35.7875386],[139.8248302,35.7874755],[139.8250627,35.787433],[139.8254596,35.7873626]]},{"id":"699692442","name":"","highway":"residential","coordinates":[[139.822741,35.7834972],[139.8235773,35.7834381]]},{"id":"705413471","name":"","highway":"residential","coordinates":[[139.8205133,35.7832561],[139.8209875,35.7832197]]},{"id":"706248427","name":"","highway":"residential","coordinates":[[139.8208361,35.7871886],[139.820907,35.7871836],[139.8211774,35.7871647],[139.8214392,35.7871464]]},{"id":"818626761","name":"","highway":"residential","coordinates":[[139.8233571,35.7857902],[139.8234262,35.7861072],[139.8230467,35.7861642]]},{"id":"818626762","name":"","highway":"residential","coordinates":[[139.8230562,35.7862566],[139.8226587,35.7862905]]},{"id":"818626763","name":"","highway":"residential","coordinates":[[139.8230316,35.7860175],[139.8226315,35.7860426]]},{"id":"818626768","name":"","highway":"residential","coordinates":[[139.8227642,35.78371],[139.823597,35.7836439],[139.8244634,35.7835754],[139.825217,35.7835157]]},{"id":"818626769","name":"","highway":"residential","coordinates":[[139.8227189,35.7832944],[139.823557,35.7832256],[139.8237846,35.7832087],[139.8238645,35.7832027],[139.8244184,35.7831615],[139.8248788,35.7831266],[139.8251752,35.7831041],[139.8253913,35.7830881]]},{"id":"818626771","name":"","highway":"residential","coordinates":[[139.8216845,35.7834705],[139.8221979,35.7834348],[139.8227299,35.7833951]]},{"id":"818626781","name":"","highway":"residential","coordinates":[[139.823334,35.7852364],[139.8232926,35.7848949],[139.8232528,35.7845658]]},{"id":"818626782","name":"","highway":"residential","coordinates":[[139.8232926,35.7848949],[139.8237261,35.7848593]]},{"id":"818627006","name":"","highway":"residential","coordinates":[[139.8192983,35.7862746],[139.8198168,35.7862411]]},{"id":"861340252","name":"","highway":"residential","coordinates":[[139.8211774,35.7871647],[139.8212229,35.7875244],[139.8212291,35.7875737]]},{"id":"861340254","name":"","highway":"residential","coordinates":[[139.8196888,35.7851309],[139.8191738,35.7851674]]},{"id":"911646462","name":"六六通り","highway":"tertiary","coordinates":[[139.822163,35.7889499],[139.821974,35.7889484],[139.8213967,35.7889438],[139.8208667,35.7889357],[139.8207863,35.7889345],[139.8207169,35.7889337],[139.8195638,35.7889211],[139.8194495,35.7889198],[139.8193441,35.7889183],[139.8182089,35.7889024],[139.8170232,35.7888885],[139.8169393,35.7888875]]},{"id":"911647508","name":"","highway":"tertiary","coordinates":[[139.8212267,35.7850777],[139.8212502,35.7852907],[139.8212541,35.7853259],[139.8212825,35.7853973]]},{"id":"911647509","name":"","highway":"tertiary","coordinates":[[139.8212117,35.7849405],[139.8212182,35.7850002],[139.8212267,35.7850777]]},{"id":"911647510","name":"","highway":"tertiary","coordinates":[[139.821898,35.7853541],[139.8220171,35.7853441],[139.8224345,35.7853113],[139.8225501,35.785303],[139.8228794,35.78528],[139.8229547,35.7852748],[139.8230169,35.7852685],[139.823334,35.7852364],[139.8236965,35.7851997],[139.8237794,35.7851913]]},{"id":"911647511","name":"","highway":"tertiary","coordinates":[[139.8212825,35.7853973],[139.8217522,35.7853654],[139.821898,35.7853541]]},{"id":"911647512","name":"平方東京線","highway":"secondary","coordinates":[[139.8221424,35.7876573],[139.8220724,35.7869853],[139.8220302,35.7866693],[139.8220203,35.7865898],[139.8220098,35.7865082],[139.8219577,35.7858736],[139.8219101,35.7854733],[139.821898,35.7853541]]},{"id":"911647514","name":"六六通り","highway":"tertiary","coordinates":[[139.8245922,35.7889786],[139.8245381,35.7889774],[139.8244793,35.788977],[139.8238756,35.7889738],[139.8233537,35.788971],[139.8233077,35.7889699],[139.822799,35.7889589],[139.8223327,35.7889523],[139.822163,35.7889499]]},{"id":"911647515","name":"","highway":"tertiary","coordinates":[[139.8169393,35.7888875],[139.8169404,35.7890091],[139.816952,35.7894065],[139.8169531,35.7894438],[139.8169542,35.7894946],[139.8169669,35.7899163],[139.8169791,35.7903319],[139.8169909,35.7907984],[139.8169985,35.7912114],[139.817,35.7912681],[139.8170013,35.7913146],[139.817,35.7917488],[139.817001,35.7919487],[139.816999,35.7924133],[139.8169958,35.7928001],[139.8169973,35.7928935]]},{"id":"911652791","name":"平方東京線（区道）","highway":"secondary","coordinates":[[139.8221908,35.7929251],[139.8221866,35.7927993],[139.8221818,35.792343],[139.822177,35.7917605],[139.8221731,35.7913734],[139.8221704,35.7903184],[139.8221691,35.7900482],[139.8221634,35.7895378],[139.8221631,35.7890783],[139.822163,35.7889499]]},{"id":"948365464","name":"平方東京線","highway":"secondary","coordinates":[[139.8218575,35.7850134],[139.8218407,35.7848786],[139.8218271,35.7847694]]},{"id":"948365465","name":"平方東京線","highway":"secondary","coordinates":[[139.821898,35.7853541],[139.8218816,35.7852065],[139.8218575,35.7850134]]},{"id":"948654139","name":"","highway":"tertiary","coordinates":[[139.8217566,35.784123],[139.8216115,35.7841349],[139.8210971,35.784175],[139.8206209,35.7842045],[139.8200499,35.784248],[139.819589,35.7842785],[139.8190812,35.7843149],[139.8185518,35.7843522],[139.8180396,35.7843871],[139.8175106,35.7844231],[139.8165406,35.7844822],[139.8164711,35.7844877]]},{"id":"948658286","name":"平方東京線","highway":"secondary","coordinates":[[139.8218271,35.7847694],[139.8217702,35.7842461],[139.8217566,35.784123]]},{"id":"1028708896","name":"","highway":"residential","coordinates":[[139.8251752,35.7831041],[139.825217,35.7835157],[139.8252518,35.7838593]]},{"id":"1126701761","name":"平方東京線（区道）","highway":"secondary","coordinates":[[139.822163,35.7889499],[139.8221603,35.788845],[139.8221478,35.7883697],[139.8221405,35.7880352],[139.8221424,35.7876573]]},{"id":"1206547213","name":"","highway":"residential","coordinates":[[139.8245462,35.7859584],[139.8250697,35.7858548]]},{"id":"1206547215","name":"","highway":"residential","coordinates":[[139.8244958,35.7857686],[139.8250225,35.7856735]]},{"id":"1206547216","name":"","highway":"residential","coordinates":[[139.8243285,35.7851381],[139.8244127,35.7854556],[139.8244958,35.7857686],[139.8245462,35.7859584],[139.8240101,35.7860669]]},{"id":"1206547224","name":"","highway":"residential","coordinates":[[139.8244127,35.7854556],[139.824942,35.785365]]},{"id":"1409769943","name":"","highway":"residential","coordinates":[[139.8248302,35.7874755],[139.824639,35.7868893]]},{"id":"1409769944","name":"","highway":"residential","coordinates":[[139.8242807,35.7869586],[139.824639,35.7868893],[139.8248394,35.7868506],[139.8253043,35.7867608]]},{"id":"1409769945","name":"","highway":"residential","coordinates":[[139.8248394,35.7868506],[139.8247794,35.7866668],[139.8247497,35.7865758],[139.8246374,35.7862318]]},{"id":"1409769946","name":"","highway":"residential","coordinates":[[139.8247497,35.7865758],[139.825234,35.7864881]]},{"id":"101971020","name":"大鷲通り","highway":"tertiary","coordinates":[[139.8223693,35.7944178],[139.8222617,35.7944784],[139.821764,35.7948085],[139.8212964,35.7951292],[139.8208379,35.7954467],[139.8204489,35.7957139],[139.8202508,35.7958512],[139.8201464,35.7959295],[139.8200463,35.7960095],[139.8199545,35.7960924],[139.81988,35.7961669],[139.8197082,35.7963696],[139.8195853,35.7965283],[139.8195369,35.7965908],[139.8194852,35.7966554],[139.8192952,35.7969039],[139.8190399,35.797223],[139.818773,35.7975638],[139.8184323,35.7979784],[139.8183716,35.79805],[139.8182689,35.7981904],[139.8179355,35.7986201],[139.8178578,35.7987141],[139.8176741,35.7989486],[139.8175885,35.7990865],[139.817543,35.7991822],[139.8175045,35.7992818],[139.8174752,35.7993877],[139.8174521,35.7995079],[139.8174482,35.7995733],[139.8174482,35.799669],[139.8174815,35.8003703],[139.8174933,35.8008],[139.8174965,35.8009138]]},{"id":"101971029","name":"","highway":"unclassified","coordinates":[[139.8277003,35.7915893],[139.8276339,35.791585],[139.8274304,35.7915582],[139.8271975,35.7915249],[139.8270116,35.7914974],[139.8268895,35.7914864],[139.8266837,35.791487],[139.8265707,35.7914687],[139.8263891,35.7914208],[139.8262945,35.7913986],[139.826198,35.7913988],[139.8260069,35.7914427],[139.8259369,35.7914564],[139.8259077,35.7914627],[139.8258356,35.7914969],[139.8255526,35.7915749],[139.8254333,35.7916115],[139.8252609,35.7916729],[139.8248076,35.7918218],[139.8246092,35.7918218]]},{"id":"120112397","name":"","highway":"unclassified","coordinates":[[139.814346,35.7969416],[139.8143561,35.7967847],[139.8143908,35.7964767],[139.8144934,35.7952212],[139.8144968,35.79518],[139.8145398,35.7946751],[139.8145836,35.7941344],[139.8146141,35.7937606],[139.8146489,35.7933558],[139.8146687,35.7931069],[139.8146963,35.7927598]]},{"id":"120112398","name":"","highway":"residential","coordinates":[[139.8228504,35.7895503],[139.8228415,35.7903148],[139.8228247,35.7913868]]},{"id":"120112403","name":"","highway":"residential","coordinates":[[139.8239635,35.7914121],[139.8239675,35.7908839],[139.8239718,35.7903088],[139.8239758,35.790031],[139.8239827,35.7895598]]},{"id":"120112407","name":"","highway":"unclassified","coordinates":[[139.820804,35.7900327],[139.8208453,35.7900331],[139.8214799,35.7900385],[139.8220212,35.7900422],[139.8221691,35.7900482]]},{"id":"120112417","name":"","highway":"unclassified","coordinates":[[139.8189193,35.7936723],[139.8188989,35.793621],[139.8188974,35.793575],[139.8188915,35.7930219],[139.8188828,35.7929448]]},{"id":"120112423","name":"","highway":"unclassified","coordinates":[[139.817,35.7917488],[139.8170715,35.7917494],[139.8171357,35.7917508],[139.8176318,35.7917618],[139.8182587,35.7917746],[139.8183247,35.791776],[139.8188704,35.7917874],[139.8191743,35.7917943],[139.819395,35.7917993],[139.8194316,35.7918001],[139.8194835,35.7918013],[139.819577,35.7917985],[139.8201306,35.791782],[139.8208023,35.7917578]]},{"id":"120112434","name":"","highway":"unclassified","coordinates":[[139.8158082,35.7928219],[139.8158035,35.7928728],[139.8157997,35.7929144],[139.815764,35.793411],[139.8157183,35.7938681],[139.8156876,35.794286],[139.815684,35.7943363],[139.8156783,35.7944133]]},{"id":"120112460","name":"","highway":"unclassified","coordinates":[[139.8246058,35.7903054],[139.8245424,35.7903057],[139.8239718,35.7903088],[139.8233525,35.7903121],[139.8228415,35.7903148],[139.8221704,35.7903184]]},{"id":"120112463","name":"","highway":"unclassified","coordinates":[[139.8214799,35.7900385],[139.8214805,35.7900817],[139.8214834,35.790559],[139.8214807,35.7913625],[139.8214832,35.7920858],[139.82149,35.7924989]]},{"id":"120112465","name":"","highway":"unclassified","coordinates":[[139.8256676,35.7931852],[139.8256488,35.7931397],[139.8254598,35.7923069],[139.8253751,35.7919256],[139.8253587,35.7918608]]},{"id":"120112477","name":"","highway":"residential","coordinates":[[139.8259599,35.7908042],[139.8259191,35.7908035],[139.8254671,35.7907961],[139.8252613,35.7907966],[139.8245967,35.7907888]]},{"id":"120112478","name":"","highway":"unclassified","coordinates":[[139.8235,35.7944527],[139.8234625,35.7944194],[139.8230947,35.7940922],[139.82289,35.7939102],[139.822907,35.7931974],[139.8234697,35.7930043],[139.8241434,35.792768],[139.8246292,35.7925977],[139.8254598,35.7923069]]},{"id":"120112487","name":"","highway":"unclassified","coordinates":[[139.8160402,35.7895076],[139.815968,35.7901574],[139.8159293,35.7905216],[139.81589,35.7909134],[139.8158705,35.7911079],[139.815866,35.791152],[139.8158611,35.7912009],[139.815856,35.7912514],[139.8158513,35.7912992],[139.815792,35.7918908],[139.8157514,35.7923309],[139.8157418,35.7924579],[139.8157222,35.792716],[139.8157179,35.7927583],[139.8157119,35.7928162]]},{"id":"120114996","name":"","highway":"unclassified","coordinates":[[139.8169669,35.7899163],[139.8170706,35.7899173],[139.8175644,35.7899406],[139.8176512,35.7899414],[139.8182773,35.7899476],[139.8183768,35.789949],[139.8186974,35.7899535],[139.8188979,35.7899563],[139.8193814,35.789964],[139.8194601,35.7899653]]},{"id":"120114997","name":"","highway":"unclassified","coordinates":[[139.8175644,35.7899406],[139.8175752,35.7894509]]},{"id":"120115011","name":"","highway":"unclassified","coordinates":[[139.8182469,35.7908397],[139.818263,35.7912924],[139.8182595,35.7916882],[139.8182591,35.7917261],[139.8182587,35.7917746]]},{"id":"120115014","name":"","highway":"unclassified","coordinates":[[139.8176318,35.7917618],[139.8176309,35.7918066],[139.8176301,35.7918514],[139.8176146,35.792449],[139.8176152,35.7929098]]},{"id":"120115015","name":"","highway":"unclassified","coordinates":[[139.8194721,35.7908786],[139.8194256,35.790877],[139.8193995,35.7908761],[139.8189037,35.790859],[139.8182469,35.7908397],[139.8176492,35.79082],[139.8171181,35.7908025],[139.8170622,35.7908007],[139.8169909,35.7907984]]},{"id":"120115024","name":"","highway":"unclassified","coordinates":[[139.8188979,35.7899563],[139.8188983,35.7900159],[139.8188986,35.7900674],[139.8189037,35.790859]]},{"id":"120115028","name":"","highway":"unclassified","coordinates":[[139.8176492,35.79082],[139.8176512,35.7899414]]},{"id":"120115039","name":"","highway":"unclassified","coordinates":[[139.8176146,35.792449],[139.8171296,35.7924213],[139.8170687,35.7924178],[139.816999,35.7924133],[139.816934,35.7924088],[139.8168829,35.7924054],[139.8163189,35.7923674],[139.8158336,35.7923362],[139.8157514,35.7923309]]},{"id":"136404444","name":"","highway":"unclassified","coordinates":[[139.821421,35.7931107],[139.8214331,35.7935987],[139.8214313,35.7939155],[139.8214238,35.7941787],[139.8214191,35.7942075],[139.8214113,35.7942551],[139.8213785,35.7943268],[139.8213326,35.7943939],[139.8212781,35.7944538],[139.8211799,35.7945292],[139.8208915,35.7947358],[139.8207868,35.7947953],[139.8206996,35.7948514],[139.8200347,35.7953303],[139.8198312,35.795479],[139.8196811,35.7956036],[139.8195519,35.7957334],[139.8194096,35.7958981],[139.8190224,35.7964038],[139.8186971,35.7968164],[139.8182398,35.7974094],[139.817668,35.7981391]]},{"id":"136404451","name":"","highway":"unclassified","coordinates":[[139.8214331,35.7935987],[139.8213541,35.7936191],[139.8195402,35.7940318],[139.818269,35.7943232],[139.8176873,35.7944646],[139.8176423,35.7944754],[139.8171385,35.7945879],[139.8170596,35.794607],[139.8169789,35.7946241],[139.8161642,35.7948082],[139.8156537,35.7949264],[139.8144968,35.79518],[139.8137493,35.7953435],[139.8135317,35.7953923],[139.8133435,35.7954302],[139.8131629,35.7954598],[139.8128258,35.7954955],[139.8126005,35.7955058],[139.8119373,35.7954891],[139.8107406,35.7954543],[139.8101257,35.7954303],[139.8100387,35.7954266]]},{"id":"136404480","name":"","highway":"unclassified","coordinates":[[139.8179685,35.7963981],[139.8179821,35.7963654],[139.8179825,35.7963278],[139.8178204,35.7954662],[139.8177163,35.7948869],[139.8176509,35.7945231],[139.8176478,35.794506],[139.8176423,35.7944754]]},{"id":"136404485","name":"","highway":"unclassified","coordinates":[[139.8156537,35.7949264],[139.8156409,35.7948835],[139.8156696,35.7945222],[139.8156783,35.7944133]]},{"id":"136404516","name":"","highway":"unclassified","coordinates":[[139.8182521,35.7933826],[139.8181888,35.7933925],[139.8179498,35.7934297],[139.8171271,35.7935578],[139.8170706,35.7935666],[139.8169895,35.7935877],[139.8169203,35.7936031],[139.8168446,35.7936193],[139.8166188,35.7936677],[139.8163231,35.793731],[139.8162226,35.7937525]]},{"id":"136404525","name":"","highway":"unclassified","coordinates":[[139.8163189,35.7923674],[139.8163162,35.7924266],[139.8163005,35.7927677],[139.8162937,35.7928508],[139.8162872,35.7929331],[139.8162226,35.7937525],[139.8161917,35.7942181],[139.8161866,35.7942957],[139.8161809,35.7943661],[139.816149,35.7947625],[139.8161642,35.7948082]]},{"id":"136404566","name":"","highway":"unclassified","coordinates":[[139.8182505,35.7929312],[139.8182508,35.7930061],[139.8182521,35.7933826],[139.8182599,35.7937258],[139.8182623,35.7938203],[139.8182611,35.7939167],[139.8182627,35.7942518],[139.818269,35.7943232],[139.8182773,35.7943693],[139.8182947,35.7944157],[139.8184046,35.7947008],[139.8184219,35.79474],[139.818475,35.7948599],[139.8185483,35.794972],[139.818631,35.7950764],[139.8187096,35.7951469],[139.8187347,35.7951675],[139.8188526,35.7952557],[139.8189667,35.7953402],[139.8191893,35.7954956],[139.8195104,35.7957062],[139.8195216,35.7957135],[139.8195519,35.7957334]]},{"id":"150435566","name":"","highway":"residential","coordinates":[[139.8228177,35.7917752],[139.822827,35.7926179],[139.8228602,35.7926922]]},{"id":"150435567","name":"","highway":"unclassified","coordinates":[[139.8194685,35.7905717],[139.8201308,35.7905712],[139.8207353,35.790563],[139.8207996,35.7905625],[139.8208673,35.7905622],[139.8214227,35.7905602],[139.8214834,35.790559]]},{"id":"150435572","name":"","highway":"residential","coordinates":[[139.822177,35.7917605],[139.8228177,35.7917752],[139.8233614,35.791773]]},{"id":"150435579","name":"","highway":"unclassified","coordinates":[[139.8201264,35.7913293],[139.8201319,35.7906241],[139.8201308,35.7905712],[139.8201278,35.79052],[139.8201227,35.7899972],[139.8201195,35.7898232],[139.8201145,35.7895482],[139.8201141,35.789501]]},{"id":"150435581","name":"","highway":"residential","coordinates":[[139.823361,35.7920301],[139.8246059,35.7917213]]},{"id":"150435851","name":"","highway":"unclassified","coordinates":[[139.8203714,35.7945443],[139.8206733,35.7947267],[139.8207236,35.7947571],[139.8207868,35.7947953],[139.8208546,35.7948368],[139.8212229,35.7950619],[139.8212964,35.7951292],[139.8213541,35.7951836],[139.8221009,35.795686]]},{"id":"153734619","name":"","highway":"residential","coordinates":[[139.8230947,35.7940922],[139.8239425,35.7935577],[139.8240241,35.7935073],[139.8244779,35.7932268],[139.8248794,35.7929787]]},{"id":"221559366","name":"","highway":"unclassified","coordinates":[[139.8201459,35.7928158],[139.8201306,35.791782]]},{"id":"221559368","name":"","highway":"unclassified","coordinates":[[139.8208065,35.7921041],[139.8214832,35.7920858]]},{"id":"221559369","name":"","highway":"unclassified","coordinates":[[139.8259324,35.7907716],[139.8259561,35.7907541],[139.8259723,35.7907097],[139.8260261,35.7905872],[139.8260486,35.7905442],[139.8260819,35.7905186],[139.826134,35.7905188],[139.8263019,35.7905552],[139.8263321,35.7905542],[139.8263683,35.7905445],[139.8264234,35.7905218],[139.826549,35.790412],[139.8266345,35.7903458],[139.8267074,35.7903002],[139.8267702,35.790274],[139.8268704,35.7902354],[139.8270211,35.7902112]]},{"id":"221559370","name":"","highway":"unclassified","coordinates":[[139.8221818,35.792343],[139.82149,35.7924989],[139.8208084,35.7926618],[139.8201459,35.7928158],[139.8194968,35.7929649]]},{"id":"229357613","name":"","highway":"unclassified","coordinates":[[139.822496,35.795352],[139.821764,35.7948085]]},{"id":"229357850","name":"","highway":"unclassified","coordinates":[[139.817001,35.7919487],[139.8169441,35.7919463],[139.8168927,35.7919431],[139.815792,35.7918908]]},{"id":"367436898","name":"","highway":"unclassified","coordinates":[[139.8156537,35.7949264],[139.8156586,35.7949629],[139.8156919,35.7952109],[139.8157929,35.7957126],[139.8157494,35.7965012],[139.8157346,35.7965587],[139.8156456,35.7968267],[139.8156354,35.7968945],[139.8156075,35.7974841],[139.8156227,35.797509],[139.8156904,35.7975188],[139.8158197,35.7975374],[139.816487,35.7976103],[139.8168168,35.7976478],[139.8171006,35.7976926],[139.8171466,35.7976999]]},{"id":"698353896","name":"","highway":"tertiary","coordinates":[[139.8259077,35.7914627],[139.8257325,35.7914555],[139.8252622,35.7914429],[139.824606,35.7914288],[139.8239635,35.7914121],[139.8233615,35.7913991],[139.8228247,35.7913868],[139.8221731,35.7913734],[139.8214807,35.7913625],[139.8208029,35.791344],[139.8201264,35.7913293],[139.8195484,35.7913179],[139.8194779,35.7913155],[139.819425,35.7913146],[139.8191581,35.7913095],[139.818263,35.7912924],[139.8170699,35.7912688],[139.817,35.7912681]]},{"id":"703512862","name":"","highway":"residential","coordinates":[[139.82289,35.7939102],[139.8221979,35.7939111],[139.8215048,35.793915],[139.8214313,35.7939155]]},{"id":"735465093","name":"","highway":"unclassified","coordinates":[[139.8188828,35.7929448],[139.8188715,35.7928885],[139.8188715,35.7928625],[139.8188705,35.791863],[139.8188704,35.7917874]]},{"id":"911646463","name":"","highway":"tertiary","coordinates":[[139.8169973,35.7928935],[139.8169966,35.7929726],[139.8169942,35.7931845],[139.8169895,35.7935877],[139.8169775,35.793995],[139.8169814,35.7941163],[139.816999,35.7942451],[139.8170596,35.794607],[139.8170685,35.7946528],[139.817124,35.7949152],[139.8171758,35.7951424],[139.8172631,35.7954933],[139.8173026,35.7956522],[139.8173543,35.7958771],[139.8173949,35.796074],[139.8174088,35.7961585],[139.817417,35.7962363],[139.817422,35.7963256],[139.8174249,35.796395],[139.8174262,35.7964634],[139.8174237,35.7965608],[139.8174031,35.7967366],[139.8173735,35.7969032],[139.8173395,35.7970522],[139.8173171,35.7971308],[139.8171466,35.7976999],[139.8170868,35.7978982],[139.8170222,35.7981397],[139.8169965,35.7982391]]},{"id":"911647513","name":"平方東京線（区道）","highway":"secondary","coordinates":[[139.8223693,35.7944178],[139.8223231,35.7943435],[139.8223193,35.7943374],[139.8222812,35.7942544],[139.8222549,35.7941783],[139.8222198,35.7940477],[139.8221979,35.7939111],[139.8221988,35.7930376],[139.8221908,35.7929251]]},{"id":"911647516","name":"","highway":"tertiary","coordinates":[[139.8169973,35.7928935],[139.8170918,35.7928978],[139.8176152,35.7929098],[139.8179562,35.7929213],[139.8182505,35.7929312],[139.8183833,35.7929341],[139.8188828,35.7929448],[139.8194968,35.7929649]]},{"id":"911652790","name":"舎人公園通り","highway":"tertiary","coordinates":[[139.8221908,35.7929251],[139.8223501,35.7928664],[139.8228602,35.7926922],[139.823367,35.7925372],[139.8246132,35.7921113],[139.8253587,35.7918608]]},{"id":"914052413","name":"平方東京線","highway":"secondary","coordinates":[[139.8228684,35.7950098],[139.8228117,35.7949456],[139.8225206,35.7946161],[139.822441,35.7945153],[139.8223693,35.7944178]]},{"id":"1126701758","name":"舎人公園通り","highway":"secondary","coordinates":[[139.8253587,35.7918608],[139.8255576,35.7917946],[139.8257085,35.7917605],[139.8258135,35.7917415],[139.8259134,35.7917306],[139.8260502,35.7917292],[139.8261268,35.7917312],[139.8262138,35.7917377],[139.8263098,35.791751],[139.8264706,35.7917869],[139.8269262,35.7919044],[139.8275633,35.7920686],[139.8276976,35.7921042]]},{"id":"1206547212","name":"","highway":"unclassified","coordinates":[[139.8259279,35.7900476],[139.8262529,35.7900376]]},{"id":"1320958370","name":"内匠橋花畑線","highway":"secondary","coordinates":[[139.8276976,35.7921042],[139.8276919,35.7922175],[139.8276919,35.7922256],[139.8276786,35.7923886],[139.8276545,35.7926199],[139.8276342,35.7927319],[139.8275587,35.792975],[139.8275371,35.7930421],[139.8275039,35.7930974],[139.8274801,35.7931234],[139.8274505,35.7931436],[139.8274181,35.7931587],[139.8273814,35.7931691],[139.8273603,35.7931709],[139.8273372,35.7931728],[139.8272901,35.7931706],[139.8271385,35.7931425],[139.8270798,35.7931364],[139.8269737,35.793138],[139.8268123,35.7931524],[139.8267703,35.7931533],[139.8266405,35.7931477],[139.8263923,35.7931311],[139.8260787,35.7931315],[139.8259704,35.7931367],[139.8258664,35.7931491],[139.8257078,35.7931736],[139.8256676,35.7931852],[139.8256087,35.7932092],[139.8254912,35.7932696],[139.825378,35.7933422],[139.825203,35.7934474],[139.8250598,35.7935288],[139.8250164,35.7935574],[139.8249809,35.7935808],[139.8248897,35.7936408],[139.8247588,35.7937253],[139.8245237,35.7938575],[139.8243619,35.7939433],[139.8243074,35.7939722],[139.8241358,35.7940687],[139.8239003,35.7942154],[139.8236701,35.7943447],[139.8235,35.7944527],[139.8233437,35.7945669],[139.8231127,35.7947856],[139.8229289,35.7949543],[139.8228684,35.7950098]]},{"id":"1320960961","name":"","highway":"residential","coordinates":[[139.8179498,35.7934297],[139.8179506,35.7933716],[139.8179529,35.7931878],[139.8179555,35.792974],[139.8179562,35.7929213]]},{"id":"1320960962","name":"","highway":"residential","coordinates":[[139.8179529,35.7931878],[139.8176618,35.7931862]]},{"id":"1320960963","name":"","highway":"residential","coordinates":[[139.8169942,35.7931845],[139.8176055,35.7931867]]},{"id":"1320961004","name":"","highway":"unclassified","coordinates":[[139.8202994,35.7945019],[139.8200981,35.7943792]]},{"id":"1320961005","name":"","highway":"unclassified","coordinates":[[139.8200981,35.7943792],[139.8198348,35.7942201],[139.8196304,35.7940966],[139.819608,35.794083],[139.8195751,35.7940627],[139.8195402,35.7940318]]},{"id":"1320961006","name":"","highway":"unclassified","coordinates":[[139.8203714,35.7945443],[139.8202994,35.7945019]]},{"id":"1320965223","name":"","highway":"residential","coordinates":[[139.8154381,35.792801],[139.8154157,35.7930129]]},{"id":"1320965224","name":"","highway":"residential","coordinates":[[139.8151821,35.7927868],[139.8151928,35.7928486],[139.81516,35.793127],[139.8146687,35.7931069]]},{"id":"1320965260","name":"","highway":"residential","coordinates":[[139.8191743,35.7917943],[139.819172,35.791727],[139.8191599,35.7913635],[139.8191581,35.7913095]]},{"id":"1368517213","name":"","highway":"residential","coordinates":[[139.8245946,35.7890842],[139.8252463,35.7890841],[139.8252425,35.789178],[139.8259166,35.7891781]]},{"id":"1368517217","name":"","highway":"residential","coordinates":[[139.8186974,35.7899535],[139.8186979,35.789635],[139.8182719,35.7896257]]},{"id":"48390571","name":"平方東京線","highway":"secondary","coordinates":[[139.8283404,35.7922763],[139.8283288,35.7924023],[139.8283124,35.7925809],[139.8282937,35.7927505],[139.8282632,35.79293],[139.8282255,35.793098],[139.8281624,35.7933189],[139.8281258,35.7934726],[139.8281124,35.7935399],[139.8280939,35.7936561],[139.8280651,35.7938282],[139.8280503,35.7939248],[139.8280401,35.7939849],[139.8280206,35.7940687],[139.8279869,35.7941726],[139.8279411,35.7942712],[139.8279013,35.7943374],[139.8278221,35.7944353],[139.8277268,35.7945178],[139.8274579,35.7946524],[139.8273258,35.79471],[139.8271828,35.7947591],[139.8270947,35.7947839],[139.8269792,35.7948106],[139.8268172,35.7948458],[139.8265482,35.7949021],[139.8261692,35.7949868],[139.825954,35.7950371],[139.8257549,35.7951005],[139.8255912,35.7951626],[139.8254222,35.7952442],[139.825174,35.7953824],[139.8250097,35.7954935],[139.8248668,35.7956132],[139.8244502,35.7959487],[139.8241999,35.7961448],[139.8241541,35.7961814],[139.8239942,35.7963088]]},{"id":"101970431","name":"","highway":"tertiary","coordinates":[[139.8123753,35.7983946],[139.8118361,35.7983325],[139.8106663,35.7982014],[139.8101401,35.7981422],[139.8100292,35.7981296],[139.8099279,35.7981179],[139.809383,35.7980547],[139.8090935,35.7980162],[139.8088018,35.7979647],[139.8086504,35.797932],[139.8079953,35.7977546],[139.8078986,35.7977284],[139.8078538,35.7977149],[139.8075352,35.7976187],[139.8068517,35.7974193],[139.8067813,35.7973987],[139.8067073,35.797379],[139.8062375,35.7972552],[139.8060085,35.7972053],[139.8055735,35.7971395],[139.8050717,35.7970694],[139.8039296,35.7969096],[139.8038469,35.796898],[139.8029457,35.7967719],[139.8022324,35.7966721],[139.8021703,35.7966673]]},{"id":"101970925","name":"平方東京線","highway":"secondary","coordinates":[[139.823054,35.7952235],[139.8228684,35.7950098]]},{"id":"101971032","name":"平方東京線","highway":"secondary","coordinates":[[139.8232968,35.7954999],[139.823054,35.7952235]]},{"id":"102170112","name":"","highway":"unclassified","coordinates":[[139.804928,35.8005393],[139.8049087,35.8004717],[139.8048609,35.8003046],[139.8048014,35.8000968],[139.8047624,35.7998773]]},{"id":"102170115","name":"","highway":"tertiary","coordinates":[[139.8055391,35.8024596],[139.8061346,35.80242],[139.8066068,35.8023894],[139.8070187,35.8023676],[139.8070778,35.8023684],[139.8074607,35.802391],[139.8076738,35.8023889],[139.8078206,35.8023894],[139.8083688,35.802382],[139.8088928,35.8023721],[139.8095419,35.8024002],[139.8100464,35.8024246],[139.8101436,35.8024293],[139.8102407,35.8024194],[139.8108821,35.8023315],[139.8112551,35.8022831],[139.8119587,35.8021892],[139.8120937,35.8021711],[139.8122021,35.8021655],[139.8128476,35.8021322],[139.8129124,35.8021288],[139.8129805,35.8021253],[139.8138437,35.8020807]]},{"id":"102170128","name":"","highway":"unclassified","coordinates":[[139.8066013,35.8021095],[139.8065427,35.802098],[139.8065293,35.8020954],[139.8055101,35.8018174],[139.8054642,35.8018048],[139.8045679,35.8015941],[139.8042574,35.8015229],[139.8040692,35.8015203],[139.8037069,35.8015198],[139.8034487,35.8015058],[139.8033534,35.8014983],[139.8028447,35.8014154],[139.802365,35.8013361],[139.8019018,35.8012604],[139.8018266,35.8012593]]},{"id":"102170134","name":"","highway":"unclassified","coordinates":[[139.8154369,35.8019233],[139.8148288,35.8018997],[139.8145187,35.80189],[139.8141275,35.8020393],[139.8140672,35.8020481],[139.8138437,35.8020807]]},{"id":"102170144","name":"","highway":"unclassified","coordinates":[[139.8066906,35.7994103],[139.8070664,35.7995461],[139.8071835,35.7995933],[139.8077641,35.7998117],[139.8077908,35.7998193],[139.8078264,35.7998294],[139.8078565,35.7998363],[139.8083177,35.7999414],[139.8085303,35.8000104]]},{"id":"102170151","name":"","highway":"tertiary","coordinates":[[139.8044389,35.7986606],[139.804636,35.7981492],[139.8047521,35.797856],[139.8049132,35.7974494]]},{"id":"102170156","name":"","highway":"unclassified","coordinates":[[139.8138824,35.8026017],[139.8139452,35.8031249],[139.8139963,35.8035499],[139.8140593,35.8041034],[139.8140662,35.8041638],[139.814117,35.8046077],[139.8141215,35.8046473]]},{"id":"102170161","name":"","highway":"unclassified","coordinates":[[139.8088709,35.7991487],[139.8088762,35.7991158],[139.8089905,35.7984137],[139.808582,35.7983589]]},{"id":"102170170","name":"","highway":"unclassified","coordinates":[[139.8049432,35.7988006],[139.804895,35.7990091],[139.8048823,35.7990845],[139.8048734,35.7991367],[139.8047762,35.799443],[139.804745,35.7995464],[139.8047352,35.7996218],[139.8047549,35.7998377],[139.8047624,35.7998773]]},{"id":"102170172","name":"","highway":"unclassified","coordinates":[[139.8100847,35.800335],[139.8100111,35.8003323],[139.8095189,35.8003142],[139.8093911,35.8003095],[139.8089169,35.8002873],[139.8082586,35.8002497],[139.8078607,35.8002359],[139.8078252,35.8002347],[139.807793,35.8002332],[139.8071347,35.8002023],[139.8066477,35.800173],[139.8066332,35.8001721],[139.8065779,35.8001689],[139.806528,35.8001653],[139.806515,35.8001644],[139.8059346,35.8001306],[139.8059472,35.7999534],[139.805997,35.7992457]]},{"id":"102170200","name":"","highway":"unclassified","coordinates":[[139.8100387,35.7954266],[139.8099632,35.7954243],[139.8094231,35.7954076],[139.8091689,35.7953998],[139.8083834,35.7953755],[139.8080483,35.7953652],[139.8074757,35.7953475]]},{"id":"102170226","name":"","highway":"unclassified","coordinates":[[139.8151514,35.8064993],[139.8151505,35.8064501],[139.8151503,35.8064127],[139.8151459,35.805713],[139.8151483,35.8056598],[139.8151631,35.8051722],[139.8151689,35.8048325],[139.8151698,35.8042478],[139.8151699,35.8041975],[139.8151735,35.8041393],[139.8152248,35.8033107],[139.8152398,35.8032704],[139.8152583,35.8032204],[139.8153644,35.8031082],[139.8153853,35.8030683],[139.8154039,35.8026209],[139.8154369,35.8019233],[139.8154272,35.8017271],[139.8154219,35.8013677]]},{"id":"102170232","name":"","highway":"residential","coordinates":[[139.8043386,35.798865],[139.8045303,35.7989604],[139.8048578,35.7990041],[139.804895,35.7990091]]},{"id":"102170238","name":"","highway":"unclassified","coordinates":[[139.8101588,35.8028317],[139.81022,35.8028274],[139.8113255,35.8027692],[139.8120017,35.8027221],[139.8124867,35.8026914],[139.8129289,35.8026592],[139.8129764,35.8026557],[139.8130281,35.8026526],[139.8138824,35.8026017],[139.8144248,35.8025737],[139.8144662,35.8025666],[139.8148282,35.8024174],[139.8150575,35.8024278],[139.8150455,35.8026158],[139.8150352,35.8028828],[139.8148376,35.8031207]]},{"id":"102170242","name":"","highway":"residential","coordinates":[[139.8034688,35.7951361],[139.8042119,35.7953728],[139.8046131,35.7955216],[139.8046837,35.7955483],[139.8053196,35.795761],[139.805369,35.7957698],[139.8054446,35.7957787],[139.8059346,35.7957898],[139.806415,35.7958014],[139.8067672,35.7958087],[139.8068145,35.7958097],[139.8074403,35.7958236],[139.8080297,35.7958369],[139.8094091,35.7958668]]},{"id":"102170246","name":"","highway":"unclassified","coordinates":[[139.8094231,35.7954076],[139.8094091,35.7958668],[139.8094091,35.7963059],[139.8094084,35.7963536],[139.8093963,35.7971794],[139.8093912,35.7973347],[139.8093834,35.7980178],[139.809383,35.7980547],[139.8093825,35.7981059],[139.8093789,35.7984607],[139.809382,35.7991801],[139.8093822,35.799221],[139.8093828,35.7992636],[139.8093924,35.8000003],[139.8093911,35.8003095]]},{"id":"102170247","name":"","highway":"unclassified","coordinates":[[139.8051143,35.8010192],[139.8051551,35.8010234],[139.806511,35.8011635],[139.8065618,35.8011688],[139.8066213,35.8011749],[139.8077817,35.8012945],[139.8085772,35.8013099],[139.80946,35.8013307],[139.8100511,35.8013301],[139.8101154,35.80133],[139.8101826,35.8013297],[139.8109824,35.8013258],[139.8119196,35.8013203],[139.812854,35.80135],[139.8129011,35.8013515],[139.8129583,35.8013534],[139.8144246,35.8014041],[139.8144976,35.8014066]]},{"id":"102170259","name":"","highway":"unclassified","coordinates":[[139.8052792,35.800559],[139.8052907,35.8005002],[139.8054038,35.7999219],[139.8055488,35.7991847],[139.8056403,35.7987459],[139.8056531,35.7986822]]},{"id":"102170265","name":"","highway":"unclassified","coordinates":[[139.8125997,35.8037463],[139.8125372,35.8032208],[139.8124867,35.8026914]]},{"id":"102170267","name":"","highway":"unclassified","coordinates":[[139.8020954,35.7974903],[139.802164,35.7975072],[139.8027068,35.7976931],[139.8032556,35.7979846],[139.8033551,35.7980498],[139.8035051,35.7981486],[139.8036778,35.7982871],[139.8037645,35.7983619],[139.8037897,35.7983816],[139.8038247,35.7983967],[139.8039329,35.7984131],[139.8040609,35.7984488],[139.8042613,35.7985799],[139.8044389,35.7986606],[139.8047686,35.7987578],[139.8049432,35.7988006]]},{"id":"102170274","name":"","highway":"unclassified","coordinates":[[139.8059272,35.8026744],[139.8056176,35.8026635],[139.8055751,35.802662],[139.8049742,35.8027121],[139.8044161,35.8027388],[139.8041398,35.8027583],[139.803823,35.8028911],[139.8037422,35.8029109],[139.8034206,35.8028948],[139.8033286,35.8028913],[139.8030317,35.802908],[139.8029871,35.8029203],[139.8028659,35.8029037],[139.8027572,35.8028791],[139.802643,35.8028502],[139.8025834,35.8028303],[139.8023929,35.8028116],[139.8023513,35.8028066],[139.8023097,35.8028017],[139.8022024,35.8027991],[139.8019917,35.8027897],[139.8019366,35.8027954],[139.8018034,35.8027942],[139.8017517,35.8027937]]},{"id":"102170326","name":"","highway":"unclassified","coordinates":[[139.8109852,35.8017634],[139.8109824,35.8013258],[139.8109723,35.8009326],[139.8109707,35.8008711]]},{"id":"102170336","name":"","highway":"unclassified","coordinates":[[139.8040692,35.8015203],[139.8040833,35.8011359],[139.8040851,35.8010355],[139.804275,35.8005572],[139.8042962,35.8005039]]},{"id":"102170345","name":"","highway":"unclassified","coordinates":[[139.8140672,35.8020481],[139.8140052,35.8019826],[139.8138742,35.8018698],[139.8138807,35.8018338],[139.813922,35.8017718],[139.8141453,35.8016048],[139.8144976,35.8014066],[139.8145846,35.8013839],[139.8146715,35.8013699],[139.8148561,35.8013721],[139.8154219,35.8013677]]},{"id":"102170346","name":"","highway":"unclassified","coordinates":[[139.8112551,35.8022831],[139.8112612,35.802325],[139.8113255,35.8027692],[139.8114014,35.8033055],[139.8114045,35.8033276],[139.8114624,35.8037426],[139.8115506,35.8043805]]},{"id":"102170351","name":"","highway":"unclassified","coordinates":[[139.8117374,35.7972506],[139.8117818,35.7977221],[139.8118409,35.7982842],[139.8118361,35.7983325],[139.8118309,35.7983803],[139.8118459,35.7989532],[139.8118615,35.7994985],[139.8118626,35.7995362],[139.8118643,35.799588],[139.8118796,35.8000432],[139.81189,35.8003862],[139.8119051,35.8008558],[139.8119058,35.8008633],[139.8119113,35.8009228],[139.8119163,35.8009863],[139.8119169,35.8009945],[139.8119196,35.8013203],[139.8119363,35.8017628],[139.811957,35.8021575],[139.8119587,35.8021892]]},{"id":"102170358","name":"","highway":"unclassified","coordinates":[[139.8036601,35.804986],[139.8036716,35.8049532],[139.8040301,35.8039342],[139.8042747,35.8033379],[139.8044044,35.8029695],[139.8044161,35.8027388],[139.8044414,35.8020811],[139.8044691,35.8019712],[139.8045679,35.8015941]]},{"id":"102170367","name":"","highway":"unclassified","coordinates":[[139.8066732,35.7989296],[139.8066087,35.7989157],[139.8063501,35.7988524],[139.8059485,35.7987522],[139.8058647,35.7987313],[139.8056531,35.7986822],[139.805575,35.798702],[139.8051657,35.7988031],[139.8051125,35.7988162],[139.8050542,35.7988257],[139.8049899,35.7988139],[139.8049432,35.7988006]]},{"id":"102170371","name":"","highway":"unclassified","coordinates":[[139.813922,35.8017718],[139.8138732,35.8017717],[139.8129639,35.8017694],[139.8129053,35.8017694],[139.8128621,35.8017691],[139.8119363,35.8017628],[139.8111859,35.8017659],[139.8109852,35.8017634],[139.8108609,35.8017639],[139.8101905,35.8017573],[139.8101263,35.8017567],[139.8100617,35.8017556],[139.8094928,35.8017458],[139.8089293,35.8017405],[139.8085624,35.8017309],[139.8077499,35.8017096],[139.8066423,35.8016824],[139.8065842,35.801681],[139.8065309,35.801671],[139.8053373,35.8014477],[139.8052951,35.8014398]]},{"id":"102170375","name":"","highway":"unclassified","coordinates":[[139.8061346,35.80242],[139.806116,35.8024555],[139.8059728,35.8026487],[139.8059272,35.8026744],[139.8056189,35.8030895],[139.8054246,35.8034557],[139.8053707,35.8035783],[139.8053263,35.8036698],[139.8052927,35.8037294],[139.8051134,35.8040644],[139.8049796,35.8042797],[139.8048804,35.8044336],[139.8047436,35.8046245],[139.8045877,35.8048486],[139.8044979,35.8049944],[139.8044381,35.8050991],[139.8044175,35.8051353]]},{"id":"102170392","name":"","highway":"unclassified","coordinates":[[139.8157741,35.8038236],[139.8157511,35.8038019],[139.8157395,35.8037909],[139.8155041,35.8035353],[139.8152885,35.8032835],[139.8152398,35.8032704],[139.815184,35.8032573],[139.814985,35.8032079],[139.8148376,35.8031207],[139.8147618,35.8030579],[139.814705,35.8029898],[139.8145228,35.8026282],[139.8144662,35.8025666],[139.8141618,35.8020927],[139.8141275,35.8020393]]},{"id":"102170396","name":"","highway":"tertiary","coordinates":[[139.8055751,35.802662],[139.8055391,35.8024596],[139.8054832,35.8021518],[139.8054642,35.8018048],[139.8054047,35.8016587],[139.8052951,35.8014398],[139.8052277,35.8013341],[139.8051769,35.8012205],[139.8051143,35.8010192],[139.8050412,35.8006943],[139.8050226,35.800647],[139.8050051,35.8005992],[139.8049904,35.8005428]]},{"id":"102170403","name":"","highway":"tertiary","coordinates":[[139.8128553,35.798446],[139.8128636,35.7990558],[139.8128739,35.7996678],[139.8128875,35.8000924],[139.8128939,35.8003942],[139.8128939,35.8009754],[139.8129011,35.8013515],[139.8129053,35.8017694],[139.8129113,35.8020733],[139.8129124,35.8021288],[139.8129195,35.8021876],[139.8129764,35.8026557],[139.813039,35.8031799],[139.8130977,35.8036891],[139.8131699,35.8042422],[139.8132291,35.8047441]]},{"id":"102170423","name":"","highway":"unclassified","coordinates":[[139.8080483,35.7953652],[139.8080297,35.7958369],[139.8080014,35.7962735],[139.8079583,35.7969345],[139.8079328,35.7973087],[139.8079035,35.7976698],[139.8078986,35.7977284],[139.8078951,35.7977826],[139.8078643,35.79826],[139.8078494,35.7985846],[139.8078167,35.798976],[139.8078064,35.7990175],[139.8077918,35.7990823],[139.807814,35.7997797],[139.8078264,35.7998294],[139.8078329,35.7998612],[139.8078252,35.8002347],[139.8078219,35.8006256],[139.8078212,35.8007014],[139.8078175,35.8007576],[139.8077817,35.8012945],[139.8077499,35.8017096],[139.8076986,35.8020713],[139.8076765,35.8023537],[139.8076738,35.8023889]]},{"id":"102170446","name":"","highway":"unclassified","coordinates":[[139.8083688,35.802382],[139.8083737,35.8023516],[139.8083792,35.8023168],[139.8085623,35.8018993],[139.8085624,35.8017309],[139.8085772,35.8013099],[139.8085805,35.8008053],[139.8085809,35.800744]]},{"id":"102170469","name":"","highway":"unclassified","coordinates":[[139.8181646,35.8024339],[139.8175961,35.8024367],[139.8175325,35.802437],[139.8174569,35.8024457],[139.8170401,35.8025157],[139.816792,35.802548],[139.816196,35.8026473],[139.815556,35.8026236],[139.8154799,35.8026222],[139.8154039,35.8026209],[139.8150455,35.8026158]]},{"id":"102170476","name":"","highway":"unclassified","coordinates":[[139.8082176,35.8007237],[139.808223,35.8006614],[139.8082586,35.8002497],[139.8083228,35.8001541],[139.8084878,35.8000534],[139.8085303,35.8000104],[139.8086052,35.7999536],[139.8091255,35.7992335],[139.8091576,35.7991891]]},{"id":"102170486","name":"","highway":"unclassified","coordinates":[[139.8083177,35.7999414],[139.8084479,35.7991446],[139.8084559,35.7990959],[139.8084629,35.7990601],[139.8085047,35.7988453],[139.8085235,35.7987377],[139.8085702,35.7984397],[139.808582,35.7983589],[139.8086427,35.7979801],[139.8086504,35.797932]]},{"id":"102170494","name":"","highway":"unclassified","coordinates":[[139.8088903,35.8007614],[139.8088937,35.8007007],[139.8089169,35.8002873],[139.8089335,35.8000616]]},{"id":"102170499","name":"","highway":"unclassified","coordinates":[[139.8078206,35.8023894],[139.8078208,35.802426],[139.8078219,35.8025891],[139.8078253,35.8030943]]},{"id":"102170509","name":"","highway":"unclassified","coordinates":[[139.8093011,35.8082216],[139.8092992,35.8080412],[139.809296,35.8077371],[139.8092859,35.8071786],[139.8092767,35.8066704],[139.8092755,35.8066075],[139.8092734,35.8065327],[139.8092597,35.8055756],[139.8092553,35.805194],[139.8092548,35.8051551],[139.8092539,35.8051179],[139.8092405,35.8045648],[139.80916,35.8040544],[139.8090774,35.8035443],[139.8089977,35.8030356],[139.8088946,35.802429],[139.8088928,35.8023721],[139.808895,35.8023343],[139.8089293,35.8017405]]},{"id":"102170526","name":"","highway":"tertiary","coordinates":[[139.8066783,35.7988704],[139.8067432,35.7988789],[139.807507,35.7989793],[139.8078064,35.7990175],[139.807864,35.7990245],[139.8084559,35.7990959],[139.8088709,35.7991487],[139.8091576,35.7991891],[139.8093822,35.799221],[139.8099573,35.799291],[139.8100632,35.7993035],[139.8101683,35.7993167],[139.8106718,35.7993818],[139.8118626,35.7995362],[139.8128739,35.7996678],[139.8129365,35.7996763],[139.8133891,35.7997374],[139.8136644,35.7997732]]},{"id":"102170530","name":"","highway":"residential","coordinates":[[139.8059472,35.7999534],[139.8054038,35.7999219],[139.8048142,35.79988],[139.8047624,35.7998773],[139.804713,35.7998789],[139.8043541,35.7999866],[139.8042017,35.7999913],[139.8040201,35.7999875],[139.8039201,35.7999845],[139.8034863,35.8000053],[139.8034557,35.7999942],[139.803461,35.7999132],[139.8034989,35.7995745],[139.8035631,35.7994706],[139.803592,35.7992824],[139.803594,35.7992691],[139.8036175,35.7992512],[139.8036581,35.7990718],[139.8036628,35.7990025],[139.8036468,35.7989693],[139.8036118,35.7989514],[139.8034756,35.7989379],[139.8034242,35.798919],[139.8034054,35.7989033],[139.8033446,35.7988404],[139.8029499,35.7986658]]},{"id":"128197199","name":"","highway":"tertiary","coordinates":[[139.8272598,35.8029213],[139.8271587,35.8029203],[139.8260815,35.8029096],[139.8258142,35.8029062],[139.8248819,35.8028972],[139.8236882,35.8028823],[139.8224772,35.8028682],[139.8220223,35.8028681]]},{"id":"128197204","name":"","highway":"unclassified","coordinates":[[139.8236086,35.8044998],[139.8236552,35.8044419],[139.8236716,35.8039242],[139.8236725,35.8038974],[139.8236882,35.8028823]]},{"id":"128197206","name":"","highway":"unclassified","coordinates":[[139.8261002,35.8019755],[139.8249572,35.8019645],[139.8249156,35.8019641],[139.8248546,35.8019628],[139.8237082,35.8019379],[139.8224929,35.8019324],[139.821806,35.8019274]]},{"id":"128197209","name":"","highway":"tertiary","coordinates":[[139.8222156,35.7990881],[139.8222971,35.7990897],[139.8225401,35.7990943],[139.8237545,35.7991063],[139.8249511,35.7991198],[139.8261474,35.7991329],[139.8263204,35.7991349]]},{"id":"128197216","name":"","highway":"unclassified","coordinates":[[139.823723,35.8010119],[139.8237347,35.8000895]]},{"id":"128197222","name":"","highway":"unclassified","coordinates":[[139.8237347,35.8000895],[139.8237545,35.7991063]]},{"id":"128197225","name":"","highway":"unclassified","coordinates":[[139.8237742,35.7977985],[139.8237545,35.7991063]]},{"id":"128197231","name":"","highway":"unclassified","coordinates":[[139.8249411,35.8010299],[139.823723,35.8010119]]},{"id":"128197235","name":"","highway":"unclassified","coordinates":[[139.8237082,35.8019379],[139.8236882,35.8028823]]},{"id":"128197241","name":"","highway":"unclassified","coordinates":[[139.824978,35.7978037],[139.8237742,35.7977985]]},{"id":"128197259","name":"","highway":"unclassified","coordinates":[[139.8225252,35.8000722],[139.8225401,35.7990943]]},{"id":"128197263","name":"","highway":"unclassified","coordinates":[[139.8271384,35.7969045],[139.8271149,35.7969042],[139.8261806,35.7968902],[139.8249907,35.7968834],[139.8244614,35.7968729],[139.8237883,35.7968671],[139.8237519,35.7968425],[139.8235304,35.7967156]]},{"id":"128197267","name":"","highway":"unclassified","coordinates":[[139.8237082,35.8019379],[139.823723,35.8010119]]},{"id":"128197274","name":"","highway":"unclassified","coordinates":[[139.8224929,35.8019324],[139.8224772,35.8028682]]},{"id":"128197284","name":"","highway":"unclassified","coordinates":[[139.8224575,35.7959954],[139.8227901,35.7962596],[139.823035,35.7963872],[139.8235589,35.7966844]]},{"id":"128197311","name":"","highway":"unclassified","coordinates":[[139.8225252,35.8000722],[139.8237347,35.8000895]]},{"id":"128197342","name":"","highway":"unclassified","coordinates":[[139.8225252,35.8000722],[139.8220123,35.8000366]]},{"id":"128197360","name":"","highway":"unclassified","coordinates":[[139.8237883,35.7968671],[139.8237742,35.7977985]]},{"id":"128197367","name":"","highway":"unclassified","coordinates":[[139.823723,35.8010119],[139.8231378,35.8010135],[139.822782,35.8010038],[139.8219557,35.8010024]]},{"id":"128197386","name":"","highway":"unclassified","coordinates":[[139.822136,35.7994159],[139.8219581,35.7993864],[139.8217719,35.7993433],[139.8210539,35.7992043],[139.8206362,35.7991132]]},{"id":"128197409","name":"","highway":"unclassified","coordinates":[[139.8249537,35.8001033],[139.8237347,35.8000895]]},{"id":"128197431","name":"","highway":"residential","coordinates":[[139.8206569,35.801419],[139.8208811,35.8014268],[139.8210491,35.8014105],[139.8210267,35.8010581],[139.8211107,35.8010521],[139.8218179,35.8010503],[139.8219484,35.8010527]]},{"id":"136404447","name":"","highway":"unclassified","coordinates":[[139.8132774,35.7987433],[139.8135391,35.7987393],[139.8135876,35.7987449],[139.8136221,35.7987602],[139.8136489,35.7987809],[139.8136647,35.7988104],[139.8137136,35.7990224],[139.8137371,35.7991373],[139.8137626,35.7992669],[139.8137766,35.7993166],[139.8138064,35.7993627],[139.8138172,35.7994928],[139.8137976,35.7995988],[139.8137694,35.7996898],[139.8137364,35.7997473],[139.8137105,35.799779],[139.8136801,35.7998339],[139.8136811,35.7999307],[139.8137008,35.8000236],[139.813648,35.800273],[139.813677,35.8003242],[139.8137327,35.8003753],[139.8140223,35.800607],[139.8141022,35.8007672],[139.8141087,35.800778],[139.8141198,35.8007963],[139.8142913,35.8008791],[139.8143102,35.8009333],[139.8143307,35.800992]]},{"id":"136404452","name":"","highway":"unclassified","coordinates":[[139.8156581,35.7998073],[139.8156463,35.7999896],[139.8156409,35.8001655],[139.815632,35.8003592],[139.8156237,35.8005444],[139.8156046,35.8009041],[139.8156015,35.8009631],[139.8155981,35.801023],[139.8155879,35.8011991],[139.8156739,35.8013673],[139.8156592,35.8016091],[139.8155896,35.8020412],[139.815556,35.8026236],[139.8155292,35.8031682],[139.8155041,35.8035353]]},{"id":"136404458","name":"","highway":"unclassified","coordinates":[[139.8191577,35.7997373],[139.819102,35.7997317],[139.8183889,35.7996604],[139.8180211,35.7996209],[139.8175756,35.7995708],[139.8175382,35.7995717],[139.8174482,35.7995733]]},{"id":"136404460","name":"","highway":"unclassified","coordinates":[[139.8163257,35.8000869],[139.8163161,35.7997188]]},{"id":"136404462","name":"","highway":"unclassified","coordinates":[[139.8148561,35.8013721],[139.8148288,35.8018997]]},{"id":"136404465","name":"","highway":"unclassified","coordinates":[[139.8166776,35.8002371],[139.817099,35.8001471]]},{"id":"136404475","name":"","highway":"unclassified","coordinates":[[139.8145187,35.80189],[139.8148282,35.8024174]]},{"id":"136404477","name":"","highway":"unclassified","coordinates":[[139.815632,35.8003592],[139.8160371,35.8003625]]},{"id":"136404486","name":"","highway":"unclassified","coordinates":[[139.8160345,35.8003172],[139.8166775,35.8003003]]},{"id":"136404487","name":"","highway":"unclassified","coordinates":[[139.8167812,35.8020114],[139.816792,35.802548]]},{"id":"136404494","name":"","highway":"unclassified","coordinates":[[139.8159955,35.8017144],[139.8170169,35.8016891]]},{"id":"136404495","name":"","highway":"unclassified","coordinates":[[139.8160252,35.8001593],[139.8156409,35.8001655]]},{"id":"136404498","name":"","highway":"unclassified","coordinates":[[139.8177977,35.7972729],[139.8178727,35.7967795],[139.8179275,35.7964613],[139.8179314,35.7964387],[139.8179685,35.7963981]]},{"id":"136404499","name":"","highway":"unclassified","coordinates":[[139.8156463,35.7999896],[139.8160142,35.7999711]]},{"id":"136404500","name":"","highway":"unclassified","coordinates":[[139.8143908,35.7964767],[139.8137498,35.7964542]]},{"id":"136404503","name":"","highway":"unclassified","coordinates":[[139.8184791,35.7986472],[139.8184745,35.7986985],[139.8184225,35.7992812],[139.8184113,35.7994068],[139.8183932,35.7996102],[139.8183889,35.7996604]]},{"id":"136404509","name":"","highway":"unclassified","coordinates":[[139.8159802,35.8020315],[139.8159955,35.8017144],[139.8160163,35.8013593]]},{"id":"136404510","name":"","highway":"unclassified","coordinates":[[139.8144955,35.8009905],[139.814533,35.8010592],[139.8146265,35.8012401],[139.8146715,35.8013699]]},{"id":"136404512","name":"","highway":"unclassified","coordinates":[[139.8132689,35.7984735],[139.8132705,35.7985228],[139.8132774,35.7987433],[139.8133158,35.7990954],[139.8133891,35.7997374]]},{"id":"136404517","name":"","highway":"unclassified","coordinates":[[139.8166665,35.8000824],[139.8163257,35.8000869],[139.8160212,35.8000904]]},{"id":"136404524","name":"","highway":"unclassified","coordinates":[[139.8169229,35.7987221],[139.816988,35.7987159],[139.8177436,35.7986393],[139.81783,35.7986306],[139.8179355,35.7986201],[139.818032,35.7986193],[139.8181052,35.7986264],[139.8184791,35.7986472],[139.8189673,35.7986759],[139.8193361,35.7986995],[139.8193971,35.7987044],[139.8194465,35.7987097]]},{"id":"136404526","name":"","highway":"unclassified","coordinates":[[139.8126005,35.7955058],[139.8125871,35.7957679],[139.8125654,35.7960586],[139.812543,35.7963651],[139.8125303,35.796611],[139.8125084,35.7968871],[139.8125028,35.7969627],[139.8124909,35.7971612],[139.8124786,35.7972844],[139.8124337,35.7977764],[139.8124104,35.7980169],[139.812379,35.798355],[139.8123753,35.7983946]]},{"id":"136404527","name":"","highway":"unclassified","coordinates":[[139.8180529,35.8009161],[139.8180529,35.8008557],[139.818053,35.8006517],[139.8180445,35.8002416],[139.8180229,35.7996806],[139.8180221,35.7996536],[139.8180211,35.7996209]]},{"id":"136404528","name":"","highway":"unclassified","coordinates":[[139.8136934,35.7973233],[139.8137169,35.7969452],[139.8137339,35.7966615],[139.8137498,35.7964542],[139.8137525,35.7964047],[139.8137859,35.7958974],[139.8137852,35.7958151],[139.8137712,35.7956224],[139.8137522,35.7953805],[139.8137493,35.7953435]]},{"id":"136404531","name":"","highway":"unclassified","coordinates":[[139.8170401,35.8025157],[139.8170227,35.8020037],[139.8170169,35.8016891],[139.8170106,35.8013272]]},{"id":"136404532","name":"","highway":"unclassified","coordinates":[[139.8117818,35.7977221],[139.8120869,35.7977097],[139.8123673,35.7977603],[139.8124337,35.7977764],[139.812715,35.7978145],[139.8132623,35.7978129]]},{"id":"136404533","name":"","highway":"unclassified","coordinates":[[139.8146709,35.7977541],[139.8140867,35.7977581],[139.8136345,35.7977535],[139.8134032,35.7977503]]},{"id":"136404539","name":"","highway":"unclassified","coordinates":[[139.8164953,35.8034872],[139.8164783,35.803451],[139.8162961,35.8030642],[139.816196,35.8028448],[139.816196,35.8026473],[139.8162098,35.8020266]]},{"id":"136404540","name":"","highway":"unclassified","coordinates":[[139.8155896,35.8020412],[139.8159802,35.8020315],[139.8162098,35.8020266],[139.8167812,35.8020114],[139.8170227,35.8020037]]},{"id":"136404541","name":"","highway":"unclassified","coordinates":[[139.8156237,35.8005444],[139.8160475,35.8005391],[139.8166923,35.8005238],[139.817172,35.800381],[139.8174054,35.8003729],[139.8174815,35.8003703]]},{"id":"136404544","name":"","highway":"unclassified","coordinates":[[139.817172,35.800381],[139.817099,35.8001471],[139.8170483,35.7999054],[139.8170073,35.7996884],[139.8170159,35.7996299]]},{"id":"136404545","name":"","highway":"unclassified","coordinates":[[139.8198761,35.7979581],[139.8198325,35.7979419],[139.8197747,35.7979205],[139.8194736,35.797809],[139.8192634,35.7977346],[139.8189064,35.7976134],[139.8188406,35.7975911],[139.818773,35.7975638],[139.8187038,35.7975384],[139.8186499,35.7975235],[139.8182812,35.7974217],[139.8182398,35.7974094],[139.8181939,35.7973952],[139.8177977,35.7972729],[139.8173764,35.7971473],[139.8173171,35.7971308]]},{"id":"136404546","name":"","highway":"unclassified","coordinates":[[139.8194852,35.7966554],[139.8194243,35.7966223],[139.8193619,35.7965884],[139.8190956,35.7964436],[139.8190224,35.7964038],[139.8189775,35.7964033],[139.8188816,35.7964029],[139.8179685,35.7963981],[139.817498,35.796395],[139.8174249,35.796395]]},{"id":"136404548","name":"","highway":"unclassified","coordinates":[[139.8166531,35.7996746],[139.8166665,35.8000824],[139.8166776,35.8002371],[139.8166775,35.8003003],[139.8166818,35.8004761],[139.8166923,35.8005238]]},{"id":"136404551","name":"","highway":"unclassified","coordinates":[[139.8178334,35.8013199],[139.8178341,35.8015007],[139.818058,35.8020148],[139.8180929,35.8021411],[139.8181646,35.8024339],[139.8182022,35.8025785],[139.8183733,35.8031173],[139.8183829,35.8031474]]},{"id":"136404558","name":"","highway":"unclassified","coordinates":[[139.8177948,35.800915],[139.8177931,35.8008555],[139.8177911,35.8007822],[139.8178049,35.8007591],[139.818053,35.8006517],[139.8181316,35.8006126],[139.8182158,35.8005638],[139.8183129,35.8004995],[139.8184818,35.8003853],[139.8185585,35.8003463],[139.8186494,35.8003092],[139.818814,35.800242],[139.8189093,35.800219],[139.8190363,35.8002147]]},{"id":"136404563","name":"","highway":"unclassified","coordinates":[[139.8160085,35.7997605],[139.8160142,35.7999711],[139.8160212,35.8000904],[139.8160252,35.8001593],[139.8160345,35.8003172],[139.8160371,35.8003625],[139.8160475,35.8005391]]},{"id":"136404569","name":"","highway":"unclassified","coordinates":[[139.8134451,35.7973178],[139.813421,35.797536],[139.8134032,35.7977503],[139.8132902,35.7977497],[139.8132633,35.7977698],[139.8132623,35.7978129],[139.8132641,35.7979594],[139.8132835,35.7980556],[139.8133125,35.7982036],[139.8133084,35.7984335],[139.8133079,35.7984653],[139.8133077,35.7984743]]},{"id":"150436781","name":"","highway":"unclassified","coordinates":[[139.8178727,35.7967795],[139.8186536,35.7968145],[139.8186971,35.7968164]]},{"id":"150436782","name":"","highway":"unclassified","coordinates":[[139.8174237,35.7965608],[139.8173723,35.7965591],[139.8169394,35.7965443],[139.8162416,35.7965211],[139.8158169,35.7965036],[139.8157494,35.7965012]]},{"id":"150436783","name":"","highway":"unclassified","coordinates":[[139.8195369,35.7965908],[139.819604,35.7966259],[139.8196461,35.7966476],[139.8205044,35.79709],[139.8205845,35.7971313],[139.8206197,35.7971494]]},{"id":"150436996","name":"","highway":"unclassified","coordinates":[[139.8137371,35.7991373],[139.8133158,35.7990954],[139.8129245,35.7990611],[139.8128636,35.7990558],[139.8128161,35.799051],[139.8118459,35.7989532],[139.8110782,35.7988794],[139.8108817,35.7988605],[139.8106737,35.7988404]]},{"id":"184746652","name":"","highway":"residential","coordinates":[[139.8042017,35.7999913],[139.8041809,35.7998306],[139.804138,35.7994464],[139.8042101,35.7993262],[139.8042173,35.7992179],[139.8043132,35.7989044],[139.8043386,35.798865]]},{"id":"184746655","name":"","highway":"unclassified","coordinates":[[139.8055735,35.7971395],[139.8055625,35.7971778],[139.8054703,35.7974978],[139.8054566,35.7976419],[139.8056054,35.7976792],[139.8059705,35.7977684],[139.8060142,35.7977789],[139.8061779,35.7978183],[139.8062202,35.7978285],[139.8063165,35.7978518],[139.8066885,35.7979417],[139.8067414,35.7979545],[139.8067954,35.7979691],[139.8073981,35.7981316],[139.8078347,35.7982519],[139.8078643,35.79826],[139.8079014,35.7982694],[139.8085702,35.7984397]]},{"id":"184746659","name":"","highway":"unclassified","coordinates":[[139.8040086,35.7977936],[139.8036008,35.7976374]]},{"id":"184746662","name":"","highway":"unclassified","coordinates":[[139.8059705,35.7977684],[139.8062205,35.7972878],[139.8062375,35.7972552]]},{"id":"184746663","name":"","highway":"unclassified","coordinates":[[139.8111859,35.8017659],[139.8112503,35.8022474],[139.8112551,35.8022831]]},{"id":"184746667","name":"","highway":"residential","coordinates":[[139.8059346,35.7957898],[139.8058602,35.7965463]]},{"id":"184746669","name":"","highway":"unclassified","coordinates":[[139.8124104,35.7980169],[139.8132835,35.7980556],[139.8141017,35.7980308],[139.8146825,35.7980148]]},{"id":"184746676","name":"","highway":"residential","coordinates":[[139.8079583,35.7969345],[139.8079222,35.7969336],[139.8068505,35.7969081],[139.8067921,35.7969067]]},{"id":"184746677","name":"","highway":"unclassified","coordinates":[[139.8054257,35.7979854],[139.8047521,35.797856]]},{"id":"184746679","name":"","highway":"residential","coordinates":[[139.8068486,35.7954],[139.8067968,35.7953982],[139.805465,35.7953631]]},{"id":"184746685","name":"","highway":"unclassified","coordinates":[[139.8108821,35.8023315],[139.8108809,35.8022998],[139.8108609,35.8017639]]},{"id":"184746687","name":"","highway":"unclassified","coordinates":[[139.8089905,35.7984137],[139.8093789,35.7984607]]},{"id":"184746690","name":"","highway":"unclassified","coordinates":[[139.8128875,35.8000924],[139.8128357,35.8000899],[139.8118796,35.8000432],[139.8118442,35.8000407],[139.8107494,35.7999639]]},{"id":"184746697","name":"","highway":"unclassified","coordinates":[[139.8036778,35.7982871],[139.8040086,35.7977936],[139.8042588,35.797405]]},{"id":"184746699","name":"","highway":"unclassified","coordinates":[[139.8058647,35.7987313],[139.8060236,35.7983743],[139.8061779,35.7978183]]},{"id":"184746700","name":"","highway":"residential","coordinates":[[139.806415,35.7958014],[139.8062473,35.7965438],[139.8062542,35.7965742],[139.8062545,35.7966038],[139.8060263,35.7971618],[139.8060085,35.7972053]]},{"id":"184746701","name":"","highway":"unclassified","coordinates":[[139.8075352,35.7976187],[139.8075234,35.7976628],[139.8073981,35.7981316],[139.8073082,35.7984606]]},{"id":"184746703","name":"","highway":"unclassified","coordinates":[[139.8067008,35.7985109],[139.806651,35.7985009],[139.8060236,35.7983743],[139.8053269,35.7982392],[139.8052883,35.7982317]]},{"id":"184746711","name":"","highway":"unclassified","coordinates":[[139.8067153,35.7983284],[139.8067699,35.7983406],[139.8073082,35.7984606],[139.8078151,35.7985767],[139.8078494,35.7985846],[139.807882,35.798592],[139.8085235,35.7987377]]},{"id":"184746713","name":"","highway":"unclassified","coordinates":[[139.8056054,35.7976792],[139.8054257,35.7979854],[139.8052883,35.7982317],[139.8052142,35.7984781],[139.8051125,35.7988162]]},{"id":"184746715","name":"","highway":"unclassified","coordinates":[[139.8108031,35.8003668],[139.8118536,35.8003856],[139.81189,35.8003862],[139.8128359,35.8003937],[139.8128939,35.8003942],[139.8129393,35.8003946],[139.813644,35.8004003],[139.8137327,35.8003753]]},{"id":"184746718","name":"","highway":"unclassified","coordinates":[[139.8054703,35.7974978],[139.8049132,35.7974494],[139.8042588,35.797405],[139.8037861,35.7973649],[139.8021892,35.7972413],[139.8021182,35.7972358]]},{"id":"184746719","name":"","highway":"tertiary","coordinates":[[139.8068074,35.7962504],[139.8080014,35.7962735],[139.8094091,35.7963059],[139.809903,35.7963177],[139.8099916,35.796319],[139.8100786,35.7963211],[139.8107642,35.7963301]]},{"id":"184746720","name":"","highway":"residential","coordinates":[[139.8067983,35.7966072],[139.8067539,35.7966045],[139.8062542,35.7965742],[139.8058602,35.7965463],[139.805213,35.7965086],[139.8043416,35.7964473]]},{"id":"184746723","name":"","highway":"residential","coordinates":[[139.8039296,35.7969096],[139.8039598,35.7968658],[139.8040827,35.7966876],[139.8043416,35.7964473],[139.8045125,35.7960833],[139.8045653,35.7958584],[139.8046837,35.7955483]]},{"id":"184746725","name":"","highway":"unclassified","coordinates":[[139.8107642,35.7963301],[139.8115349,35.796357],[139.8116908,35.7963576],[139.8121141,35.7963612],[139.812543,35.7963651],[139.8137525,35.7964047]]},{"id":"184746727","name":"","highway":"unclassified","coordinates":[[139.8096306,35.8035219],[139.8095945,35.8030105],[139.8095458,35.8024457],[139.8095419,35.8024002],[139.8095395,35.8023698],[139.8094943,35.8017879],[139.8094928,35.8017458],[139.80946,35.8013307],[139.8094231,35.8008485],[139.8094187,35.800791]]},{"id":"185469602","name":"","highway":"unclassified","coordinates":[[139.803759,35.8019749],[139.8044691,35.8019712]]},{"id":"217827870","name":"","highway":"unclassified","coordinates":[[139.8188034,35.802705],[139.819277,35.8026718],[139.8195304,35.8026532],[139.8198719,35.802628],[139.8198941,35.8026433],[139.8198983,35.8026856],[139.8199047,35.8028167],[139.8199119,35.8028745],[139.8199615,35.8031628],[139.8194722,35.8036776],[139.8194713,35.8037251]]},{"id":"217827872","name":"","highway":"unclassified","coordinates":[[139.819277,35.8026718],[139.8192863,35.8037382],[139.8193496,35.8040196],[139.8193869,35.8041736],[139.8194311,35.8043347],[139.8194976,35.8045798],[139.8195205,35.8046271],[139.8196181,35.8048109],[139.8198513,35.8052019]]},{"id":"217827896","name":"","highway":"unclassified","coordinates":[[139.8156235,35.7983434],[139.8156219,35.7983906],[139.8156115,35.7986904],[139.8155987,35.7989158],[139.8155927,35.7991237],[139.8155837,35.7991385],[139.8155599,35.7991509],[139.8155329,35.7991543],[139.8154443,35.7991598],[139.8154731,35.7994965],[139.8151646,35.7995152],[139.8144851,35.7995675],[139.8141237,35.7995824],[139.8137976,35.7995988]]},{"id":"217827897","name":"","highway":"unclassified","coordinates":[[139.8151646,35.7995152],[139.8151489,35.7993092],[139.8151359,35.7991777],[139.8151096,35.7989418],[139.8150913,35.7987221],[139.81507,35.7984269],[139.8150668,35.7983822]]},{"id":"217827898","name":"","highway":"unclassified","coordinates":[[139.8145228,35.8000048],[139.8144851,35.7995675],[139.8144637,35.7993506],[139.8144279,35.7989842],[139.8144071,35.7987668],[139.8143808,35.7984622],[139.8143775,35.7984242]]},{"id":"217830404","name":"","highway":"unclassified","coordinates":[[139.8086052,35.7999536],[139.8089335,35.8000616],[139.8093924,35.8000003]]},{"id":"229357612","name":"","highway":"unclassified","coordinates":[[139.8204489,35.7957139],[139.8203998,35.7956684],[139.8200639,35.7953573],[139.8200347,35.7953303]]},{"id":"229484052","name":"","highway":"tertiary","coordinates":[[139.8220626,35.8029775],[139.8220809,35.8030274],[139.8221516,35.80319],[139.8222601,35.8034165],[139.8223445,35.8035647],[139.8224195,35.8036756],[139.8224945,35.8037604],[139.82257,35.8038234],[139.8227146,35.8039209],[139.8227657,35.8039527],[139.822813,35.8039821],[139.8232388,35.804258],[139.8236086,35.8044998],[139.8238379,35.8046508],[139.8240752,35.8047974],[139.8241802,35.8048632],[139.8242482,35.8049059],[139.8244756,35.8050474],[139.8248151,35.8052641],[139.8250043,35.8053975],[139.8252309,35.8055678],[139.8255085,35.8057934],[139.8257594,35.806006],[139.8258604,35.8060978],[139.8259037,35.8061357],[139.8259286,35.806157],[139.8259742,35.8061961],[139.8262165,35.8064036],[139.8265159,35.8066563],[139.8266096,35.8067243],[139.8269334,35.8069367],[139.8270107,35.8069853],[139.8270931,35.8070403],[139.8277119,35.8074533],[139.8280167,35.8076749],[139.8280727,35.8077125],[139.8285245,35.8080485],[139.8286597,35.8081484],[139.8288165,35.8082407],[139.829282,35.8084695],[139.8293626,35.8085092]]},{"id":"229484056","name":"内匠橋花畑線","highway":"secondary","coordinates":[[139.8228684,35.7950098],[139.8227831,35.7950882],[139.822496,35.795352],[139.822451,35.795396],[139.8223779,35.7954667],[139.822131,35.7956622],[139.8221009,35.795686],[139.8220715,35.7957129],[139.8217232,35.7960312],[139.8216055,35.7961388],[139.8213139,35.7964217],[139.8211247,35.7966051],[139.8209388,35.7967984],[139.8206197,35.7971494],[139.8203965,35.7974164],[139.820225,35.7976418],[139.8201719,35.7977058],[139.8198761,35.7979581],[139.8197006,35.7981234],[139.819656,35.7981703],[139.8196048,35.7982322],[139.8195691,35.7982885],[139.819564,35.7982966],[139.8195255,35.7983707],[139.8194922,35.7984471],[139.8194716,35.7985334],[139.8194465,35.7987097],[139.8194229,35.7988921],[139.8193929,35.7989995],[139.819377,35.7990565],[139.8193367,35.7992195],[139.8193044,35.7993325],[139.8192539,35.7994803],[139.8191857,35.7996455],[139.8191577,35.7997373],[139.8191433,35.7997795],[139.8190691,35.8000303],[139.8190514,35.8001197],[139.8190363,35.8002147],[139.8190179,35.8005434],[139.8190009,35.8008666],[139.8189981,35.80092],[139.8189891,35.8009722],[139.8189413,35.8013269],[139.818898,35.8016205],[139.8188463,35.8019465],[139.8188374,35.8020489],[139.8188201,35.8024784],[139.8188034,35.802705],[139.8187828,35.8030392],[139.8187801,35.8030825],[139.8187822,35.8031266],[139.818788,35.80325],[139.8187985,35.8034407],[139.8188539,35.8037636],[139.8189338,35.80407],[139.8189861,35.8042365],[139.8190041,35.8042939],[139.8190681,35.8044632],[139.8191478,35.8046548],[139.819185,35.8047333],[139.8193414,35.8050292],[139.8195056,35.8052793],[139.8197569,35.805631],[139.8199643,35.8059006],[139.8201182,35.8061583],[139.820142,35.8061982]]},{"id":"229484411","name":"花畑フラワーロード","highway":"tertiary","coordinates":[[139.8018031,35.8003642],[139.8019005,35.8003697],[139.8020284,35.8003769],[139.8021305,35.8003825],[139.8024515,35.8004011],[139.8027404,35.8004167],[139.8028887,35.800425],[139.8029869,35.8004299],[139.8035746,35.8004635],[139.8042962,35.8005039],[139.804819,35.8005332],[139.804928,35.8005393],[139.8049904,35.8005428],[139.8051013,35.800549],[139.8052792,35.800559],[139.8064626,35.8006252],[139.8065488,35.8006301]]},{"id":"231089177","name":"","highway":"residential","coordinates":[[139.8162416,35.7965211],[139.8162583,35.7963093],[139.816268,35.7961082],[139.8169577,35.7961303],[139.8173463,35.7960803],[139.8173949,35.796074]]},{"id":"231089178","name":"","highway":"residential","coordinates":[[139.8162583,35.7963093],[139.8169516,35.7963362]]},{"id":"231089179","name":"","highway":"residential","coordinates":[[139.8168687,35.7957181],[139.8172449,35.795661],[139.8173026,35.7956522]]},{"id":"231089180","name":"","highway":"residential","coordinates":[[139.8169394,35.7965443],[139.8169516,35.7963362],[139.8169577,35.7961303],[139.8168687,35.7957181],[139.8167487,35.7951967],[139.8167722,35.7951728],[139.8171241,35.7951463],[139.8171758,35.7951424]]},{"id":"251756332","name":"","highway":"residential","coordinates":[[139.8088018,35.7979647],[139.8088042,35.7979243],[139.8088394,35.7973249]]},{"id":"251756334","name":"","highway":"residential","coordinates":[[139.810718,35.7977829],[139.8117393,35.7977245],[139.8117818,35.7977221]]},{"id":"251756337","name":"","highway":"residential","coordinates":[[139.808531,35.8030563],[139.8083787,35.8024231],[139.8083688,35.802382]]},{"id":"251756339","name":"","highway":"residential","coordinates":[[139.8093963,35.7971794],[139.8099373,35.7972026],[139.8100026,35.7972054],[139.810781,35.7972274]]},{"id":"251756340","name":"","highway":"residential","coordinates":[[139.8079328,35.7973087],[139.8079604,35.7973092],[139.8088394,35.7973249],[139.8093912,35.7973347]]},{"id":"251756341","name":"","highway":"residential","coordinates":[[139.8120017,35.8027221],[139.8120467,35.80255],[139.8121814,35.8023776],[139.8121973,35.8022147],[139.8122021,35.8021655]]},{"id":"251757975","name":"","highway":"residential","coordinates":[[139.8076986,35.8020713],[139.8066548,35.8021076],[139.8066013,35.8021095]]},{"id":"251757976","name":"","highway":"residential","coordinates":[[139.8071347,35.8002023],[139.8071835,35.7995933]]},{"id":"251757982","name":"","highway":"residential","coordinates":[[139.8070664,35.7995461],[139.8074409,35.7992951],[139.8074976,35.7990243],[139.807507,35.7989793]]},{"id":"313881331","name":"","highway":"unclassified","coordinates":[[139.8048823,35.7990845],[139.8049194,35.7990901],[139.8051477,35.7991244],[139.8055488,35.7991847],[139.805997,35.7992457]]},{"id":"314974498","name":"","highway":"unclassified","coordinates":[[139.8170159,35.7996299],[139.8169489,35.7996391],[139.8166531,35.7996746],[139.8163161,35.7997188],[139.8160085,35.7997605],[139.8156581,35.7998073]]},{"id":"314974501","name":"","highway":"tertiary","coordinates":[[139.8174482,35.7995733],[139.8173576,35.7995868],[139.8173466,35.7995883],[139.8170159,35.7996299],[139.8170173,35.7995823],[139.8170175,35.7995777],[139.8169665,35.7993059],[139.8169409,35.799152],[139.8169248,35.7990036],[139.8169194,35.7988702],[139.8169229,35.7987221],[139.8169284,35.7985495],[139.8169468,35.7984343],[139.8169688,35.7983363],[139.8169965,35.7982391]]},{"id":"355260531","name":"","highway":"unclassified","coordinates":[[139.8136345,35.7977535],[139.8136623,35.7973229]]},{"id":"355260535","name":"","highway":"unclassified","coordinates":[[139.8146522,35.7973567],[139.814621,35.7973555]]},{"id":"355260537","name":"","highway":"unclassified","coordinates":[[139.8141098,35.7984433],[139.8141089,35.7983987],[139.8141017,35.7980308],[139.8140867,35.7977581],[139.8140677,35.7973384]]},{"id":"355260539","name":"","highway":"unclassified","coordinates":[[139.814695,35.7984041],[139.8146937,35.7983639],[139.8146825,35.7980148],[139.8146709,35.7977541],[139.8146522,35.7973567]]},{"id":"367434398","name":"","highway":"residential","coordinates":[[139.81996,35.8013335],[139.8193707,35.8013298],[139.8190254,35.8013275],[139.8189413,35.8013269],[139.8188608,35.8013267],[139.8185896,35.8013261],[139.8178334,35.8013199]]},{"id":"367434399","name":"","highway":"unclassified","coordinates":[[139.8198697,35.8009214],[139.8193805,35.8009215]]},{"id":"367434400","name":"","highway":"residential","coordinates":[[139.8188463,35.8019465],[139.818913,35.8019457],[139.8193665,35.8019399],[139.8196658,35.8019363],[139.8199193,35.8019332],[139.8199728,35.8015277],[139.81996,35.8013335],[139.8199484,35.8011558],[139.8199055,35.8010221],[139.8198887,35.8009747],[139.8198697,35.8009214],[139.8198431,35.8008652],[139.819684,35.8005256]]},{"id":"367434403","name":"","highway":"residential","coordinates":[[139.8193736,35.8010206],[139.8199055,35.8010221]]},{"id":"367436900","name":"","highway":"unclassified","coordinates":[[139.8146522,35.7973567],[139.814688,35.7967978]]},{"id":"367436903","name":"","highway":"residential","coordinates":[[139.8140236,35.8002432],[139.8142869,35.8006601],[139.8144574,35.8009301],[139.8144955,35.8009905]]},{"id":"367436905","name":"","highway":"residential","coordinates":[[139.8157965,35.7979776],[139.8170422,35.7979009],[139.8170868,35.7978982]]},{"id":"367436907","name":"","highway":"residential","coordinates":[[139.8151096,35.7989418],[139.8155987,35.7989158]]},{"id":"367436912","name":"","highway":"residential","coordinates":[[139.8148285,35.7993268],[139.8147714,35.798742]]},{"id":"367436914","name":"","highway":"unclassified","coordinates":[[139.814329,35.7973471],[139.814346,35.7969416]]},{"id":"367436915","name":"","highway":"residential","coordinates":[[139.8143561,35.7967847],[139.814688,35.7967978],[139.8156456,35.7968267]]},{"id":"367436917","name":"","highway":"residential","coordinates":[[139.8151646,35.7995152],[139.8151969,35.7998346],[139.8155575,35.7998133],[139.8156581,35.7998073]]},{"id":"367436919","name":"","highway":"residential","coordinates":[[139.8141773,35.8001688],[139.8141237,35.7995824],[139.8140727,35.7990025]]},{"id":"367436921","name":"","highway":"unclassified","coordinates":[[139.8158197,35.7975374],[139.8157965,35.7979776],[139.8157764,35.7982998],[139.8157743,35.7983338]]},{"id":"367436923","name":"","highway":"residential","coordinates":[[139.8162184,35.798305],[139.8162228,35.7983514],[139.8162544,35.798685],[139.8168714,35.7987189],[139.8169229,35.7987221]]},{"id":"367436925","name":"","highway":"residential","coordinates":[[139.8137136,35.7990224],[139.8140727,35.7990025],[139.8144279,35.7989842]]},{"id":"367436927","name":"","highway":"residential","coordinates":[[139.8144637,35.7993506],[139.8148285,35.7993268],[139.8151489,35.7993092]]},{"id":"367436931","name":"","highway":"residential","coordinates":[[139.8137327,35.8003753],[139.8140236,35.8002432],[139.8141773,35.8001688],[139.8145228,35.8000048]]},{"id":"367436934","name":"","highway":"residential","coordinates":[[139.8136647,35.7988104],[139.8144071,35.7987668],[139.8147714,35.798742],[139.8150913,35.7987221],[139.8156115,35.7986904]]},{"id":"378378707","name":"平方東京線","highway":"secondary","coordinates":[[139.826632,35.7994938],[139.826331,35.7991471],[139.8263204,35.7991349],[139.8260794,35.7988228],[139.8252538,35.7978348],[139.8250671,35.7975983],[139.8249733,35.7974796],[139.8249046,35.7973982],[139.8244614,35.7968729],[139.8242323,35.796602],[139.8239942,35.7963088],[139.8232968,35.7954999]]},{"id":"630853468","name":"","highway":"residential","coordinates":[[139.8188201,35.8024784],[139.8187424,35.8024832],[139.8182022,35.8025785]]},{"id":"693697700","name":"","highway":"unclassified","coordinates":[[139.8156739,35.8013673],[139.8160163,35.8013593],[139.8170106,35.8013272],[139.8174445,35.8013242],[139.8175099,35.8013237],[139.8175786,35.8013229],[139.8178334,35.8013199]]},{"id":"697997480","name":"","highway":"tertiary","coordinates":[[139.814621,35.7973555],[139.814329,35.7973471],[139.8140677,35.7973384],[139.8136934,35.7973233],[139.8136623,35.7973229],[139.8134451,35.7973178],[139.8124786,35.7972844],[139.8117374,35.7972506],[139.8112914,35.797237],[139.810781,35.7972274]]},{"id":"697997481","name":"","highway":"unclassified","coordinates":[[139.8154443,35.7991598],[139.8151359,35.7991777]]},{"id":"697997482","name":"","highway":"unclassified","coordinates":[[139.8136644,35.7997732],[139.8137105,35.799779]]},{"id":"698252852","name":"","highway":"unclassified","coordinates":[[139.8180929,35.8021411],[139.8175947,35.8021488],[139.8175267,35.8021499]]},{"id":"698252863","name":"","highway":"residential","coordinates":[[139.8193665,35.8019399],[139.8193707,35.8013298],[139.8193736,35.8010206],[139.8193745,35.8009815],[139.8193754,35.8009725],[139.8193805,35.8009215],[139.819388,35.8008673],[139.8193828,35.8005329]]},{"id":"698252864","name":"","highway":"residential","coordinates":[[139.819684,35.8005256],[139.8193828,35.8005329],[139.8190893,35.8005414],[139.8190179,35.8005434],[139.8189635,35.8005439],[139.8186697,35.8005466],[139.8184028,35.800549],[139.8183129,35.8004995]]},{"id":"698252865","name":"花畑フラワーロード","highway":"tertiary","coordinates":[[139.8193805,35.8009215],[139.8191033,35.8009204],[139.8189981,35.80092],[139.818906,35.8009196],[139.8180529,35.8009161],[139.8177948,35.800915],[139.8176372,35.8009144],[139.8174965,35.8009138]]},{"id":"698319032","name":"","highway":"unclassified","coordinates":[[139.8199545,35.7960924],[139.820009,35.7961404],[139.8202234,35.7963293],[139.8204703,35.7965425],[139.8209009,35.7967777],[139.8209388,35.7967984]]},{"id":"698319033","name":"","highway":"unclassified","coordinates":[[139.8208379,35.7954467],[139.8208948,35.7954881],[139.8209041,35.7954949],[139.8216858,35.7960067],[139.8217232,35.7960312]]},{"id":"703512865","name":"","highway":"residential","coordinates":[[139.8203965,35.7974164],[139.8198583,35.7971582],[139.8194005,35.7969536],[139.8193699,35.7969399],[139.8192952,35.7969039]]},{"id":"703512866","name":"","highway":"residential","coordinates":[[139.8190399,35.797223],[139.8191027,35.7972511],[139.8191582,35.7972764],[139.8201719,35.7977058]]},{"id":"703512867","name":"","highway":"residential","coordinates":[[139.8189673,35.7986759],[139.8189291,35.7990139],[139.819377,35.7990565]]},{"id":"724673665","name":"","highway":"unclassified","coordinates":[[139.8207421,35.8023191],[139.8207762,35.8026069],[139.8207962,35.8026953],[139.8208986,35.8029995],[139.8209904,35.8032786],[139.8211819,35.8037978],[139.8212403,35.8039499],[139.8212835,35.8039629],[139.8217847,35.8038705],[139.8220258,35.8038615],[139.8223392,35.8038278],[139.8224945,35.8037604]]},{"id":"911617033","name":"花畑大橋通り","highway":"tertiary","coordinates":[[139.8101023,35.8008293],[139.8101053,35.8009393],[139.8101154,35.80133],[139.8101263,35.8017567],[139.8101416,35.8023499],[139.8101436,35.8024293],[139.8101449,35.8024956],[139.8101588,35.8028317],[139.8101543,35.8030134],[139.8101634,35.8031808],[139.8101769,35.8033513],[139.810197,35.8034988],[139.8102189,35.8036054],[139.8103183,35.8039994],[139.8105732,35.8049558],[139.8105941,35.8050342]]},{"id":"911617034","name":"花畑フラワーロード","highway":"tertiary","coordinates":[[139.8101023,35.8008293],[139.8102456,35.8008367],[139.8108775,35.8008665],[139.8109707,35.8008711],[139.8118548,35.8009198],[139.8119113,35.8009228],[139.8128939,35.8009754],[139.8135147,35.8009902],[139.8143307,35.800992],[139.8144955,35.8009905],[139.8155243,35.8009655],[139.8156015,35.8009631],[139.8173628,35.8009173],[139.8174965,35.8009138]]},{"id":"911630779","name":"","highway":"tertiary","coordinates":[[139.8066886,35.8066127],[139.8066869,35.8064672],[139.8066805,35.8061823],[139.8066698,35.8056017],[139.8066623,35.8051356],[139.8066519,35.8046311],[139.806643,35.8041133],[139.8066383,35.8036018],[139.8066232,35.8030864],[139.8066068,35.8023894],[139.8066013,35.8021095],[139.8065842,35.801681],[139.8065618,35.8011688],[139.8065509,35.8007227],[139.8065488,35.8006301]]},{"id":"911630780","name":"花畑フラワーロード","highway":"tertiary","coordinates":[[139.8065488,35.8006301],[139.8066352,35.8006349],[139.8078212,35.8007014],[139.8078679,35.800704],[139.8082176,35.8007237],[139.8085809,35.800744],[139.8088903,35.8007614],[139.8094187,35.800791],[139.8099645,35.8008215],[139.8101023,35.8008293]]},{"id":"911646464","name":"","highway":"residential","coordinates":[[139.8172631,35.7954933],[139.8173149,35.7954908],[139.8178204,35.7954662]]},{"id":"914052411","name":"大鷲通り","highway":"tertiary","coordinates":[[139.8174965,35.8009138],[139.8175,35.8010241],[139.8175099,35.8013237],[139.8175267,35.8021499],[139.8175325,35.802437],[139.8175521,35.8032279],[139.8175541,35.8033035]]},{"id":"945667500","name":"","highway":"tertiary","coordinates":[[139.8239942,35.7963088],[139.8237996,35.7964555],[139.8236994,35.7965395],[139.8235589,35.7966844],[139.8235304,35.7967156],[139.8233947,35.7968944]]},{"id":"948658285","name":"","highway":"tertiary","coordinates":[[139.8196048,35.7982322],[139.8195602,35.7982011],[139.8190096,35.7981233],[139.8187118,35.7980847],[139.8184971,35.7980467],[139.8184376,35.7980442],[139.8183716,35.79805],[139.8180965,35.7980903],[139.817668,35.7981391],[139.8170743,35.7982222],[139.8169965,35.7982391]]},{"id":"1016747033","name":"","highway":"tertiary","coordinates":[[139.8169965,35.7982391],[139.8168788,35.7982651],[139.8162184,35.798305],[139.8157743,35.7983338],[139.8157024,35.798338],[139.8156235,35.7983434],[139.8150668,35.7983822],[139.814695,35.7984041],[139.8143775,35.7984242],[139.8141098,35.7984433],[139.8139021,35.7984578],[139.813726,35.7984687],[139.8135392,35.7984722],[139.8133077,35.7984743],[139.8132689,35.7984735],[139.8128553,35.798446],[139.8123753,35.7983946]]},{"id":"1101840814","name":"","highway":"unclassified","coordinates":[[139.8066392,35.7993926],[139.8066906,35.7994103]]},{"id":"1104076547","name":"","highway":"residential","coordinates":[[139.8043224,35.7988064],[139.8044237,35.7986952],[139.8044389,35.7986606]]},{"id":"1320958371","name":"","highway":"residential","coordinates":[[139.8186697,35.8005466],[139.818668,35.8003422],[139.8186494,35.8003092]]},{"id":"1320958571","name":"","highway":"residential","coordinates":[[139.8184225,35.7992812],[139.8181693,35.7992642]]},{"id":"1320958572","name":"","highway":"residential","coordinates":[[139.8184113,35.7994068],[139.8181593,35.7993899]]},{"id":"1357104053","name":"","highway":"tertiary","coordinates":[[139.8219557,35.8010024],[139.8219484,35.8010527]]},{"id":"1357104060","name":"","highway":"tertiary","coordinates":[[139.8219484,35.8010527],[139.8219276,35.8012109],[139.8218961,35.8013942],[139.8218175,35.8018277],[139.821806,35.8019274],[139.821804,35.8020198],[139.821818,35.8021264],[139.8218703,35.8023564],[139.8219238,35.8025592],[139.8219918,35.8027822],[139.8220223,35.8028681],[139.8220626,35.8029775]]},{"id":"1357104062","name":"","highway":"tertiary","coordinates":[[139.8233947,35.7968944],[139.8232496,35.7970856],[139.8231515,35.7972197],[139.8230615,35.7973517],[139.8229459,35.7974981],[139.8228422,35.7976016],[139.8228076,35.7976333],[139.8227413,35.7976941],[139.8226828,35.7977596],[139.8226371,35.7978418],[139.8225257,35.798085],[139.8224335,35.7983195],[139.8223627,35.7985214],[139.8223248,35.7986571],[139.8222262,35.7990464],[139.8222156,35.7990881],[139.822136,35.7994159],[139.8220887,35.7996047],[139.8220589,35.7997474],[139.8220345,35.7998683],[139.8220123,35.8000366],[139.8219938,35.8003168],[139.8219779,35.8005587],[139.8219557,35.8010024]]}],"intersections":[{"id":1177188940,"name":"花畑交番前","lat":35.79805,"lng":139.8183716},{"id":1179205648,"name":"花畑第一小西","lat":35.798446,"lng":139.8128553},{"id":1177188863,"name":"西六町北","lat":35.7870082,"lng":139.8166434}],"extraction":"OSM API v0.6 map; existing 2026-10-24 local extracts plus bbox 139.804,35.794,139.824,35.803"}